| Which Company are you working for? | Built Electrical QLD |
|---|
| Which Trade are you working for? | Electrical |
|---|
| State | QLD |
|---|
| Date of Visit | 08/05/2018 |
|---|
| Technician's Name | Andrew Farmer |
|---|
| Built Job Number | 30428 |
|---|
| Swarovski Site in QLD | pacific_fair |
|---|
| Test Period | 3 Monthly (90 minutes) |
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au | No |
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| General Works Checklist | - Inspect all furniture and fittings for visible damage
- Inspect all walls, ceilings, skirtings and floors for visible damage
- Inspect storefront, façade and store LED logo for correct operations and visible damage
- Inspect roller shutter and doors for correct operations and visible damage
- Check fire extinguishers, update compliance tags/labels
|
|---|
| Are there any repairs and additional works required? | No |
|---|
| Fire Extinguisher Details | | Type (ABE Powder) |
Size (4.5kg) |
Last Test Date |
Manufacture Date |
Pressure Indicator (Green Zone) |
Location In Store |
Compliant (Y/N) |
| ABE Powder |
4.5kg |
1/18 |
1/11 |
Green zone |
Boh |
Y |
|
|---|
| Next Test Due in 3 months | 08/08/2018 |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Technician's Name | Andrew Farmer |
|---|
| Store Manager's Name | Di Bao |
|---|
| |
|---|
| |