| Which Company are you working for? | Built Electrical |
|---|
| Which Trade are you working for? | Electrical |
|---|
| State | NSW |
|---|
| Date of Visit | 16/05/2018 |
|---|
| Technician's Name | Matthew Mullins |
|---|
| Built Job Number | 30449 |
|---|
| Swarovski Site in NSW | penrith |
|---|
| Test Period | 3 Monthly (90 minutes) |
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au | Yes |
|---|
| If Yes, please upload all copies of legends here... (Limit of 6 megabytes total) |  |
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Material light box display |
Shop windows |
2 displays |
Need to be changed to LED, 32 x 1200mm lights in total for replacement. |
N |
Y |
Y |
N |
| Movable window displays |
Shop windows |
2 |
TPS is becoming damaged with the movement of the cabinets, couloured isulation is becoming visable |
N |
Y |
Y |
Repair would need to happen outside of business hours, hammer drill required |
|
|---|
| General Works Checklist | - Inspect all furniture and fittings for visible damage
- Inspect all walls, ceilings, skirtings and floors for visible damage
- Inspect storefront, façade and store LED logo for correct operations and visible damage
- Inspect roller shutter and doors for correct operations and visible damage
- Check fire extinguishers, update compliance tags/labels
|
|---|
| Are there any repairs and additional works required? | Yes |
|---|
| General List of Repairs and additional works required | | Defect Item |
Location of Item |
Details of Problem |
Repaired on Site |
Quote to be Sent |
Comments |
| White cabinets |
Shop floor |
Chipped white panelling |
N |
Y |
Touch up paint might be enough |
| Cabinet locks |
Shop floor |
Sticky locks, dont always lock or unlock |
N |
Y |
N |
| Glass cupboard |
Shop floor near storeroom door |
Glass doors catch on frame of cabinet, can be awkrard to open, is scratching chrome finish |
N |
Y |
N |
|
|---|
| Fire Extinguisher Details | | Type (ABE Powder) |
Size (4.5kg) |
Last Test Date |
Manufacture Date |
Pressure Indicator (Green Zone) |
Location In Store |
Compliant (Y/N) |
| ABE |
4.5kg |
1/18 |
10/11 |
Y |
In storeroom behind door |
Y |
|
|---|
| Next Test Due in 3 months | 15/08/2018 |
|---|
| Technician's Name | Matthew Mullins |
|---|
| Store Manager's Name | Lesley Sweeney |
|---|
| |
|---|
| |