Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit16/05/2018
Technician's NameMatthew Mullins
Built Job Number30449
Swarovski Site in NSWpenrith
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Material light box display Shop windows 2 displays Need to be changed to LED, 32 x 1200mm lights in total for replacement. N Y TBA Quote to be sent for approval.
Movable window displays Shop windows 2 TPS is becoming damaged with the movement of the cabinets, coloured insulation is becoming visible. N Y TBA Quote to be sent for approval. Repair would need to happen outside of business hours as hammer drill is required.
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
White cabinets Shop floor Chipped white panelling N N Touch up paint might be enough. John, please advise if repairs are required.
Cabinet locks Shop floor Sticky locks, don't always lock or unlock N N Repairs approved by John 24/5/18. To be scheduled as soon as possible.
Glass cupboard Shop floor near storeroom door Glass doors catch on frame of cabinet, can be awkward to open, is scratching chrome finish N N John, please advise if repairs are required.
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE 4.5kg 01/18 10/11 Y In storeroom behind door. Y
Next Test Due in 3 months15/08/2018
Site Status SelectorStore now fully compliant
Technician's NameMatthew Mullins
Store Manager's NameLesley Sweeney