Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit25/07/2018
Technician's NameMatthew Mullins
Built Job Number31964
Swarovski Site in NSWsydney_westfield
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 1 Y P
DB1 2 Y P
DB1 3 Y P
DB1 4 Y P
DB1 5 Y P
DB1 6 Y P
DB1 7 Y P
DB1 8 Y P
DB1 9 Y P
DB1 10 Y P
DB1 11 Y P
DB1 12 Y P
DB1 13 Y P
DB1 14 Y P
DB1 15 Y P
DB1 16 Y P
DB1 17 Y P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 01 R Y Y Y P
DB1 02 R Y Y Y P
DB1 03 R Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?Yes
Comments

Clean

Fixture draws able to open and close freely?Yes
Comments

Yes

Locks work on all fixtures?Yes
Comments

Yes

Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
Comments

Skirting looks good

General cleanliness of fixtures, ceilings, P.O.S - provide detailsYes
Comments

Nice and clean

Roller shutters in working order and clean?No
Comments

N/A

General cleanliness of Façade? - provide detailsYes
Comments

Nice and clean

Lighting operational, (eg logo)?Yes
Comments

Working fine

Windows clean?Yes
Comments

Yes

Door handles clean and tight?Yes
Comments

Yes

ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Exit Lights Shop Floor - No Exit Lights installed onsite. N Y TBA Quote to be sent for approval.
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?No
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE 4.5kg N/A 05/18 Y Storeroom beside switchboard Y
Confirm how many power points are underneath the window box?One
Next Test Due in 3 months24/10/2018
Site Status SelectorStore now fully compliant
Technician's NameMatthew Mullins
Store Manager's NameWilliam Graciadus