Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateVIC
Date of Visit24/07/2018
Technician's NameCorey Vella
Built Job Number31999
Swarovski Site in VICmyer_chadstone
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Timers
  • Check timers for correct operation and timing
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auNo
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?Yes
Fixture draws able to open and close freely?Yes
Locks work on all fixtures?Yes
Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsYes
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsYes
Lighting operational, (eg logo)?Yes
Windows clean?Yes
Door handles clean and tight?Yes
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Display lights Counter display 2 Faulty Y N N After thorough investigation, technician found out that the wiring connections to the drivers are loose because it gets hit by the cabinet drawers. Tech fixed the wiring connection out of the drawers way. Tested lights on completion
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?No
Confirm how many power points are underneath the window box?One
Next Test Due in 3 months24/10/2018
Site Status SelectorStore now fully compliant
Technician's NameCorey Vella
Store Manager's NameHarneet Dhillom
ADMIN ONLY -(Store Email Address)Email hidden; Javascript is required.