Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
Report any failures and provide costing to rectify (where applicable)
Timers
Check timers for correct operation and timing
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au
No
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?
No
Paint & surfaces are clean?
Yes
Fixture draws able to open and close freely?
Yes
Locks work on all fixtures?
Yes
Is there chips, dents or defects to joinery?
No
Is there damage to skirtings?
No
General cleanliness of fixtures, ceilings, P.O.S - provide details
Yes
Roller shutters in working order and clean?
Yes
General cleanliness of Façade? - provide details
Yes
Lighting operational, (eg logo)?
Yes
Windows clean?
Yes
Door handles clean and tight?
Yes
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
Display lights
Counter display
2
Faulty
Y
N
N
After thorough investigation, technician found out that the wiring connections to the drivers are loose because it gets hit by the cabinet drawers. Tech fixed the wiring connection out of the drawers way. Tested lights on completion
General Works Checklist
Inspect all furniture and fittings for visible damage
Inspect all walls, ceilings, skirtings and floors for visible damage
Inspect storefront, façade and store LED logo for correct operations and visible damage
Inspect roller shutter and doors for correct operations and visible damage
Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?
No
Confirm how many power points are underneath the window box?
One
Next Test Due in 3 months
24/10/2018
Site Status Selector
Store now fully compliant
Technician's Name
Corey Vella
Store Manager's Name
Harneet Dhillom
ADMIN ONLY -(Store Email Address)
Email hidden; Javascript is required.
The Built Services Group seeks to apply innovation and technology for greater client services, business efficiencies and thinking Green.