Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateWA
Date of Visit13/08/2018
Technician's NameAdam Hoes
Built Job Number32050
Swarovski in WAmorley_galleria
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
db 01 main switch not rcd not rcd
L1 Y P
L2 Y P
L3 Y P
L4 Y P
L5 Y P
L6 Y P
L7 Y P
L8 Y P
sign y p
exit Y P
P1 Y P
P2 Y P
P3 Y P
door Y P
blank blank blank
blank blank blank
timer timer timer
lighting contactor lighting contactor lighting contactor
lighting contactor lighting contactor lighting contactor
lighting contactor lighting contactor lighting contactor
lighting contactor lighting contactor lighting contactor
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 01 EM 01 S Y Y Y P
DB 01 EM 02 S Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 01 EX 01 Y Y Y P
DB 01 EX 02 Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?Yes
Fixture draws able to open and close freely?Yes
Locks work on all fixtures?Yes
Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsYes
Comments

Store clean and tidy

Roller shutters in working order and clean?No
Comments

Roller shutter operation works all fine, however is dusty on both sides.
Recommend a clean.

General cleanliness of Façade? - provide detailsYes
Lighting operational, (eg logo)?Yes
Windows clean?Yes
Door handles clean and tight?Yes
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Switchboard Back of House 1 Not compliant due to restricted access N Y TBA Shelving required to be moved to meet code due to restricted access
Pendant Light Shop Floor 1 LED Internal N Y TBA John, please confirm if repairs are required
General Works Checklist
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
Are there any repairs and additional works required?Yes
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE Powder 1.9kg April/2018 June/2014 Green Back of House Y
Confirm how many power points are underneath the window box?One
Next Test Due in 3 months13/11/2018
Site Status SelectorStore now fully compliant
Technician's NameAdam Hoes
Store Manager's NameZia van Aswegen