Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateSA
Date of Visit15/10/2018
Technician's NameMelanie Mattiske
Built Job Number12345
Swarovski Site in SAadelaide
Test Period9 Monthly
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auNo
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
1 1 1 1 1 1 1 1
Paint & surfaces are clean?No
Comments

1

Fixture draws able to open and close freely?No
Locks work on all fixtures?No
Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsNo
Roller shutters in working order and clean?No
General cleanliness of Façade? - provide detailsNo
Lighting operational, (eg logo)?No
Windows clean?No
Door handles clean and tight?No
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
1 1 1 1 1 1 1 1
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
1 1 1 1 1 1
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
1 1 1 1 1 1 1
Next Test Due in 3 months17/10/2018
Technician's Name1 1
Store Manager's Name1 1