Date of Visit16/10/2018
Technician's NameNathan McBain
Built Job Number34472
Swarovski Site in VICchadstone
Test Period9 Monthly
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?Yes
Fixture draws able to open and close freely?Yes
Locks work on all fixtures?Yes
Is there chips, dents or defects to joinery?Yes
Comments

Cabinet door behind counter LHS, screws have come loose and LHS door is no longer fixed.

Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsYes
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsYes
Lighting operational, (eg logo)?Yes
Windows clean?Yes
Door handles clean and tight?Yes
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
Cabinet fixings LHS behind counter Screws stripped Y N Refit with larger screws
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE Powder 4.5 April 2018 Aug 2008 Y Store Room Y
Next Test Due in 3 months16/01/2019
Site Status SelectorStore now fully compliant
Technician's NameNathan McBain
Store Manager's NameAnne Huynh