| Which Company are you working for? | Built Electrical |
|---|
| Which Trade are you working for? | Electrical |
|---|
| State | VIC |
|---|
| Date of Visit | 17/10/2018 |
|---|
| Technician's Name | Nathan McBain |
|---|
| Built Job Number | 34472 |
|---|
| Swarovski Site in VIC | doncaster |
|---|
| Test Period | 9 Monthly |
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au | Yes |
|---|
| If Yes, please upload all copies of legends here... (Limit of 6 megabytes total) |  |
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| Paint & surfaces are clean? | Yes |
|---|
| Fixture draws able to open and close freely? | No |
|---|
| Comments | Retrein cabinets hard to open 6 cabinets 3 draws each
|
|---|
| Locks work on all fixtures? | No |
|---|
| Comments | Wall Cabinets no 5,7 rhs locks not latching
Wall Cabinets no 2 lhs locks not latching
Wall cabinets x2 not closing correctly
|
|---|
| Is there chips, dents or defects to joinery? | No |
|---|
| Is there damage to skirtings? | No |
|---|
| General cleanliness of fixtures, ceilings, P.O.S - provide details | Yes |
|---|
| Any issues found onsite please take photos and upload here | |
|---|
| Roller shutters in working order and clean? | Yes |
|---|
| General cleanliness of Façade? - provide details | Yes |
|---|
| Lighting operational, (eg logo)? | Yes |
|---|
| Windows clean? | Yes |
|---|
| Door handles clean and tight? | Yes |
|---|
| ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Crystal lighting |
Centre column |
2 |
Failed to illuminate |
N |
N |
TBA |
Will be replaced once lighting gets delivered from China |
| Square recessed shop fitting |
Ceiling above watches |
1 |
Failed to illuminate |
N |
N |
TBA |
Will be replaced once lighting gets delivered from China |
| Crystal lighting |
Lhs when facing shop entrance |
1 |
Failed to illuminate |
N |
N |
TBA |
Will be replaced once lighting gets delivered from China |
| Wall cabinets |
Lhs 2 and rhs 5,7 |
3 |
Locks not latching |
Y |
N |
N |
|
| Wall cabinets |
RHS & LHS |
2 |
Drawer does not locked into rails correctly |
Y |
N |
N |
|
|
|---|
| General Works Checklist | - Inspect all furniture and fittings for visible damage
- Inspect all walls, ceilings, skirtings and floors for visible damage
- Inspect storefront, façade and store LED logo for correct operations and visible damage
- Inspect roller shutter and doors for correct operations and visible damage
- Check fire extinguishers, update compliance tags/labels
|
|---|
| Are there any repairs and additional works required? | No |
|---|
| Fire Extinguisher Details | | Type (ABE Powder) |
Size (4.5kg) |
Last Test Date |
Manufacture Date |
Pressure Indicator (Green Zone) |
Location In Store |
Compliant (Y/N) |
| Powder |
2.5kg |
Jan 18 |
01/2012 |
Green zone |
Back of store |
Y |
|
|---|
| Next Test Due in 3 months | 17/01/2019 |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Technician's Name | Nathan McBain |
|---|
| Store Manager's Name | Amara Jane |
|---|
| |
|---|
| |