| Which Company are you working for? | Built Electrical |
|---|
| Which Trade are you working for? | Electrical |
|---|
| State | WA |
|---|
| Date of Visit | 24/10/2018 |
|---|
| Technician's Name | Adam Hoes |
|---|
| Built Job Number | 34487 |
|---|
| Swarovski in WA | perth |
|---|
| Test Period | 9 Monthly |
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au | Yes |
|---|
| If Yes, please upload all copies of legends here... (Limit of 6 megabytes total) |  |
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| Paint & surfaces are clean? | Yes |
|---|
| Fixture draws able to open and close freely? | Yes |
|---|
| Locks work on all fixtures? | No |
|---|
| Comments | TALL DISPLAY MISSING REAR LOCK NUT
|
|---|
| Is there chips, dents or defects to joinery? | Yes |
|---|
| Comments | WATCH VIRTRINE GLASS NEEDS SECURING
|
|---|
| Is there damage to skirtings? | No |
|---|
| General cleanliness of fixtures, ceilings, P.O.S - provide details | Yes |
|---|
| Any issues found onsite please take photos and upload here | |
|---|
| Roller shutters in working order and clean? | No |
|---|
| Comments | N/A
|
|---|
| General cleanliness of Façade? - provide details | Yes |
|---|
| Lighting operational, (eg logo)? | Yes |
|---|
| Windows clean? | Yes |
|---|
| Door handles clean and tight? | Yes |
|---|
| ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Switchboard |
Store room |
1 |
Non accessible not to code, too high and not 600mm clearance from door |
N |
N |
N |
25/10/18 - John Cowles has approved works. To be completed under Job #35092 |
| Test and tagging |
Entire store |
Multiple |
Nothing tagged |
N |
N |
N |
25/10/18 - John Cowles has approved works. To be completed under Job #35092 |
| 5 rail schott spot rail |
Shop floor |
1 |
Lamp fault |
N |
Y |
TBA |
John, please confirm if repairs are required |
|
|---|
| General Works Checklist | - Inspect storefront, façade and store LED logo for correct operations and visible damage
|
|---|
| Are there any repairs and additional works required? | Yes |
|---|
| Fire Extinguisher Details | | Type (ABE Powder) |
Size (4.5kg) |
Last Test Date |
Manufacture Date |
Pressure Indicator (Green Zone) |
Location In Store |
Compliant (Y/N) |
| ABE |
2.5kg |
June/2018 |
09/2016 |
Green |
BOH |
Y |
|
|---|
| Next Test Due in 3 months | 24/01/2019 |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Technician's Name | Adam Hoes |
|---|
| Store Manager's Name | LIANNA RITCHIE |
|---|
| |
|---|
| |