Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateSA
Date of Visit15/11/2018
Technician's NameSteve Waterman
Built Job Number34483
Swarovski Site in SAadelaide
Test Period9 Monthly
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?No
Comments

Plaster and paintwork around door to stockroom is chipped.

Fixture draws able to open and close freely?Yes
Locks work on all fixtures?No
Comments

2x B1 vitrine locks need replacing #18301 key

Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsYes
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?No
Comments

NA

General cleanliness of Façade? - provide detailsYes
Lighting operational, (eg logo)?Yes
Windows clean?Yes
Door handles clean and tight?Yes
General Works Checklist
  • Inspect all walls, ceilings, skirtings and floors for visible damage
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
Fire Extinguisher Store Overdue for testing N N 23.11.18 - Received approval from John Cowles to test Fire Extinguisher
2 x Locks Vitrine Need replacing N N 23.11.18 - Received approval from John Cowles to replace once we have received locks from overseas
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE 4.5kg Sep 2017 July 2017 Y Store N
Next Test Due in 3 months15/02/2019
Site Status SelectorCompleted but with repairs required
Technician's NameSteve Waterman
Store Manager's Nameivana milosevic