Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit23/01/2019
Technician's NameEddie Zaida
Built Job Number36431
Swarovski Site in NSWqueen_victoria_building
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (12 Month)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 1 Y 36 43 P
2 Y 33 24 P
3 Y 29 19 P
4 Y 35 23 P
6 Y 36 37 P
7 Y 32 24 P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
  • Is there an Emergency Light Test Facility & is it labelled properly?
  • Yes
  • No
Is there an Emergency Light Test Facility & is it labelled properly?Yes
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 01 R Y Y Y P
02 R Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 01 Y Y Y P
02 Y Y Y P
03 Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?No
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?Yes
Fixture draws able to open and close freely?Yes
Locks work on all fixtures?No
Comments

Lock broken on display drawer

Is there chips, dents or defects to joinery?Yes
Comments

Scratches on joinery

Is there damage to skirtings?Yes
Comments

Scratches on skirtings throughout store

General cleanliness of fixtures, ceilings, P.O.S - provide detailsGood
Comments

Finger prints and dirt on and near AC panels

Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsGood
Lighting operational, (eg logo)?No
Comments

2 x window displays have damaged cables due to display movement. Notified staff not to move display any further forward. Leads have been replaced. Photos attached

Windows clean?Yes
Door handles clean and tight?No
Comments

Scratches on handles

Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Window Display Cabling Front window 2 Damaged cables Y N N
LED Lamps BOH 4 Lamps out Y N N
Circuit Breaker SWB 1 Needs to be changed to RCD Y N N
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
Fire Extinguisher BOH Testing required N N John approved works via email 29/1/19
Display Drawer Shop Floor Lock broken N N John approved works via email 29/1/19
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
CO2 2.2kg 06/2018 08/2015 Yes BOH N
Next Test Due in 3 months23/04/2019
Site Status SelectorCompleted but with repairs required
Technician's NameEddie Zaida
Store Manager's NameKoko Zheng