Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit24/01/2019
Technician's NameEddie Zaida
Built Job Number36431
Swarovski Site in NSWhomebush_dfo
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (12 Month)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 Cb1 Y 23 19 P
Cb2 Y 30 20 P
Cb3 Y 29 18 P
Cb4 Y 28 18 P
Cb5 Y 28 18 P
Cb6 Y 33 23 P
Cb7 Y 33 23 P
Cb8 Y 28 20 P
Cb9 Y 19 10 P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
  • Is there an Emergency Light Test Facility & is it labelled properly?
  • Yes
  • No
Is there an Emergency Light Test Facility & is it labelled properly?Yes
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 01 S Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 01 Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)Swarovski-Homebush-DFO-SB-Legend.doc
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?No
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?Yes
Fixture draws able to open and close freely?Yes
Locks work on all fixtures?No
Comments

2 x locks broken, need replacing

Is there chips, dents or defects to joinery?Yes
Comments

Various units have chips

Is there damage to skirtings?Yes
Comments

Scratches

General cleanliness of fixtures, ceilings, P.O.S - provide detailsYes
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsYes
Lighting operational, (eg logo)?Yes
Comments

Majority of lighting operational. Some issues reported above. Lots of dust on the chain holding the track lights.

Windows clean?Yes
Door handles clean and tight?Yes
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
LED Batten BOH 1 Not working Y N N Spare fitting used from stock.
12-Way LED Panel Store 2 3 lights on each panel not working N N TBA If repairs are required, please send work request to service@builtelectrical.com.au (prior trade repairs recommended)
Display Light Mini Tower Store 8 Not working, no power to lighting under cabinets N N TBA If repairs are required, please send work request to service@builtelectrical.com.au (prior trade repairs recommended)
Ceiling Track Lights Store 3 Not working N N TBA If repairs are required, please send work request to service@builtelectrical.com.au (prior trade repairs recommended)
Window Display Lighting Store 2 Cable squashed/damaged N N TBA If repairs are required, please send work request to service@builtelectrical.com.au (prior trade repairs recommended)
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
2 x Locks Display Cabinets Faulty - need replacing N N Current service job raised to fix (35935)
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE Powder 4.5kg 12/2018 10/2018 Green BOH Y
Next Test Due in 3 months24/04/2019
Site Status SelectorStore now fully compliant
Technician's NameEddie Zaida
Store Manager's NameFlorida Cas