Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit05/02/2019
Technician's NameEddie Zaida
Built Job Number36431
Swarovski Site in NSWchatswood
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (12 Month)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 Cb1 Y 28 37 P
Cb2 Y 9 17 P
Cb3 Y 22 28 P
Cb4 Y 16 29 P
Cb5 Y 16 28 P
Cb6 Y 19 27 P
Cb7 Y 7 19 P
Cb8 Y - - F Tripping N
Cb9 Y 10 21 P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Is there an Emergency Light Test Facility & is it labelled properly?Yes
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 R Y Y Y P
2 R Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?No
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?No
Comments

Marks, scratches

Fixture draws able to open and close freely?No
Comments

Vitrine drawer does not close x 3
One of the window display doors is falling off

Locks work on all fixtures?No
Comments

Various latches do not catch through on various displays

Is there chips, dents or defects to joinery?Yes
Comments

Chips, scratches

Is there damage to skirtings?Yes
Comments

Scratches

General cleanliness of fixtures, ceilings, P.O.S - provide detailsGood
Comments

Beads on column fixture have ripped loose

Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsGood
Lighting operational, (eg logo)?No
Windows clean?Yes
Door handles clean and tight?No
Comments

Front entry missing grub screw, loose

Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
9-Way Mini Spot Lights Displays 5 Various lights out N N TBA If repairs are required, please send work request to service@builtelectrical.com.au
Window Display Box Window 1 Hardwired into power point, not enough clearance N Y TBA Quote to be sent for approval for repairs.
28W 865 Lamp Display signage 4 Not working Y N N
36W 865 Lamp Display signage 2 Not working Y N N
Main Cable Switchboard 1 Repairs required to fix the active conductors in the main switch, too many. Y N N
CB8 Switchboard 1 After repairs to main cable, CB8 kept tripping. Upon investigation, front light box has a lot of burnt out cable and brittle terminals. N Y TBA Quote to be sent for approval.
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
C02 Fire Extinguisher BOH Requires testing N N John approved works via email 8/2/19
Vitrine Cabinets Various Vitrine drawer does not close x 3 N N John approved works via email 8/2/19
Window display door Window display One of the doors is falling off N N John approved works via email 8/2/19
Latches Various cabinets Latches do not catch properly N N John approved works via email 8/2/19
Column fixture Shop floor Beads have been ripped loose N N John approved works via email 8/2/19
Front Door Front of shop Front entry missing grub screw, loose N N John approved works via email 8/2/19
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
C02 2.5kg 06/2018 02/2018 Green BOH N
Next Test Due in 3 months05/05/2019
Site Status SelectorCompleted but with repairs required
Technician's NameEddie Zaidaq
Store Manager's NameJohn Shen