Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateVIC
Date of Visit01/05/2019
Technician's NameNathan McBain
Built Job Number39731
Swarovski Site in VICfountain_gate
Test Period3 Monthly
Is there an Emergency Light Test Facility & is it labelled properly?Yes
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?No
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?Yes
Comments

Slight marks on the ceiling near hanging light fitting.
Slight damage to plaster near front man hole.

Fixture draws able to open and close freely?Yes
Locks work on all fixtures?Yes
Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsGood
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsGood
Lighting operational, (eg logo)?Yes
Windows clean?Yes
Door handles clean and tight?Yes
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Light Box Shopfloor 1 Wiring is taped to the floor from flex running from ground N N TBA Raised under Service Job# 40356
3-Spot Crystal lights Column - Bottom 5 Failed to illuminate N N TBA Lights need to be ordered. If repairs are required, please send work request to service@builtelectrical.com.au
3-Spot Crystal lights Column - Top 13 Failed to illuminate N N TBA Faulty spots near the glass wall will be impossible to replace due to very limited space and EWP GR20 required to access. If repairs are required, please send work request to service@builtelectrical.com.au
36W Fluorescent lamp BOH 1 Failed to illuminate N Y TBA Attempted to replace but found out the whole fitting requires replacement. Suggest upgrading to LED. If repairs are required, please send work request to service@builtelectrical.com.au
Are there any repairs and additional works required?No
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
Powder ABE 2.5kg MARCH 19 09/18 Green BOH Y
Next Test Due in 3 months01/08/2019
Site Status SelectorStore now fully compliant
Technician's NameNathan McBain
Store Manager's NameIrene Huynh