Is there an Emergency Light Test Facility & is it labelled properly?
Yes
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au
Yes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?
Yes
Are there any Warranty items needing to be repaired?
No
Paint & surfaces are clean?
No
Comments
Joinery units have scratches and paint chips to all.
Fixture draws able to open and close freely?
Yes
Locks work on all fixtures?
No
Comments
Damage to drawer runners, can’t be locked due to damage.
Is there chips, dents or defects to joinery?
Yes
Comments
Joinery units have scratches and paint chips to all.
Is there damage to skirtings?
No
General cleanliness of fixtures, ceilings, P.O.S - provide details
Good
Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?
Yes
General cleanliness of Façade? - provide details
Good
Lighting operational, (eg logo)?
No
Comments
8 x ceiling lights out, all square fittings. Replacements no longer available. (As Above)
Windows clean?
Yes
Door handles clean and tight?
Yes
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
Ceiling Lights
Ceiling
8
Not operational
N
N
TBA
These fittings need to be replaced, they fall to pieces when opening covers. If repairs are required, please send work order to service@builtelectrical.com.au.
General Works Checklist
Inspect all furniture and fittings for visible damage
Inspect all walls, ceilings, skirtings and floors for visible damage
Inspect storefront, façade and store LED logo for correct operations and visible damage
Inspect roller shutter and doors for correct operations and visible damage
Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?
Yes
General List of Repairs and additional works required
Defect Item
Location of Item
Details of Problem
Repaired on Site
Quote to be Sent
Comments
Joinery units
Various
Scratched and dented
N
N
If repairs are required, please send work order to service@builtelectrical.com.au
Drawer Runners
Various
Cannot be locked due to damage
N
N
If repairs are required, please send work order to service@builtelectrical.com.au
Fire Extinguisher Details
Type (ABE Powder)
Size (4.5kg)
Last Test Date
Manufacture Date
Pressure Indicator (Green Zone)
Location In Store
Compliant (Y/N)
ABE Powder
4.5kg
10/2018
08/2018
Yes
Office
Y
Next Test Due in 3 months
01/08/2019
Site Status Selector
Store now fully compliant
Technician's Name
Kyle Morton
Store Manager's Name
Eduardo Alonso