Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit01/05/2019
Technician's NameEddie Zaida
Built Job Number39670
Swarovski Site in NSWeastgardens
Test Period3 Monthly
Is there an Emergency Light Test Facility & is it labelled properly?Yes
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)Swarovski-Eastgardens-SB-Legend.doc
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?Yes
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?No
Comments

Marks on joinery and walls

Fixture draws able to open and close freely?Yes
Locks work on all fixtures?No
Comments

Watch vitrine jams sometimes
Always vitrine jams often

Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsGood
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsGood
Lighting operational, (eg logo)?No
Comments

As listed in Electrical list of repairs

Windows clean?Yes
Door handles clean and tight?Yes
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
9 Spot Rail Light Shop Floor 1 All lights out N N TBA If repairs are required, please send work order to service@builtelectrical.com.au.
9 Spot Rail Light Shop Floor 1 1 light out N N TBA If repairs are required, please send work order to service@builtelectrical.com.au.
5 Spot Rail Light Shop Floor 6 1 light out on each N N TBA If repairs are required, please send work order to service@builtelectrical.com.au.
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
Joinery and Walls Various Marked N N If repairs are required, please send work order to service@builtelectrical.com.au.
Watch Vitrine Shop Floor Jams sometimes N N If repairs are required, please send work order to service@builtelectrical.com.au.
'Always' Vitrine Shop Floor Jams often N N If repairs are required, please send work order to service@builtelectrical.com.au.
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
C02 3.5kg 12/2018 11/2018 Y BOH Y
Next Test Due in 3 months01/08/2019
Site Status SelectorStore now fully compliant
Technician's NameEddie Zaida
Store Manager's NameStore Manager