Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
Report any failures and provide costing to rectify (where applicable)
Is there an Emergency Light Test Facility & is it labelled properly?
Yes
Timers
Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB-T8B
1
R
Y
Y
Y
P
2
R-BOH
Y
Y
Y
P
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB-T8B
1
Y
Y
Y
P
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au
Yes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?
Yes
Are there any Warranty items needing to be repaired?
No
Paint & surfaces are clean?
Yes
Fixture draws able to open and close freely?
No
Comments
1 x draw is unable to close fully
Locks work on all fixtures?
Yes
Comments
1 set of locks - Store Manager does not have keys to open it, number on lock is 07001
(Key has been sent to Store Manager)
Is there chips, dents or defects to joinery?
No
Is there damage to skirtings?
No
General cleanliness of fixtures, ceilings, P.O.S - provide details
Good
Any issues found onsite please take photos and upload here
Comments
N/A
General cleanliness of Façade? - provide details
Good
Comments
Water damage has gotten worse since last audit. There is more mould showing behind counter on gyprock ceiling.
Lighting operational, (eg logo)?
Yes
Comments
Canvas display light wiring is getting old and fragile with cracks in the sheath due to time and overheating. Down the track we might have to replace with LED strip lighting or linkable LED fluoro's. Otherwise we will have to replace wiring and ballasts.
Windows clean?
Yes
Door handles clean and tight?
No
Comments
Shop entry door handles have come loose on both glass doors.
Any issues found onsite please take photos and upload here
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
5 Spot LED Track Light
Shop Floor
1
1 x lamp out
N
N
TBA
If repairs are required, please send request to service@sturdie.com.au.
9 Spot LED Track Light
Shop Floor
1
1 x lamp out
N
N
TBA
If repairs are required, please send request to service@sturdie.com.au.
7 Spot LED Track Light
Shop Floor
1
1 x lamp out
N
N
TBA
If repairs are required, please send request to service@sturdie.com.au.
Swarovski canvas light display
Shop Floor
8
Lamps out
Y
N
N
Swarovski canvas light display
Shop Floor
Various
Wiring getting old and fragile, may need to be replaced with LED strip lights (see above notes)
N
Y
TBA
Quote to be provided.
General Works Checklist
Inspect all furniture and fittings for visible damage
Inspect all walls, ceilings, skirtings and floors for visible damage
Inspect storefront, façade and store LED logo for correct operations and visible damage
Inspect roller shutter and doors for correct operations and visible damage
Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?
Yes
General List of Repairs and additional works required
Defect Item
Location of Item
Details of Problem
Repaired on Site
Quote to be Sent
Comments
Cabinet Drawer
Shop floor
1 x draw unable to close fully
N
N
To be repaired during next audit as per John.
Lock Set
Lock number 07001
Manager does not have key to open
Y
N
Key has been sent to Store Manager.
Ceiling
Behind Counter
Water damage on gyprock
N
N
John, please arrange repairs.
Shop Entry Doors
Front of store
Door handles are loose
N
N
To be repaired during next audit as per John.
Fire Extinguisher Details
Type (ABE Powder)
Size (4.5kg)
Last Test Date
Manufacture Date
Pressure Indicator (Green Zone)
Location In Store
Compliant (Y/N)
Dry Powder
4.5kg
07/2019
10/2011
Y
BOH
Y
Next Test Due in 3 months
24/10/2019
Site Status Selector
Store now fully compliant
Technician's Name
Keith Haly
Store Manager's Name
Lesley Catlow