Which Company are you working for?Sturdie Trade Services
Which Trade are you working for?Electrical
StateQLD
Date of Visit06/08/2019
Technician's NameJoshua Bagetti
Built Job Number42309
Swarovski Site in QLDgarden_city
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
2082/2083 5 Y P
2082/2083 6 Y P
2082/2083 7 Y P
2082/2083 8 Y P
2082/2083 8 Y P
2082/2083 9 Y P
2082/2083 10 Y P
2082/2083 11 Y P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Is there an Emergency Light Test Facility & is it labelled properly?Yes
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
1 y y y p
1 y y y p
1 y y y p
1 y y y p
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
1 y y y p
1 y y y p
1 y y y p
1 y y y p
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auNo
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?Yes
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
- - - - - - - -
Paint & surfaces are clean?Yes
Comments

N/A

Fixture draws able to open and close freely?Yes
Comments

N/A

Locks work on all fixtures?Yes
Comments

N/A

Is there chips, dents or defects to joinery?No
Comments

N/A

Is there damage to skirtings?No
Comments

N/A

General cleanliness of fixtures, ceilings, P.O.S - provide detailsGood
Comments

N/A

Roller shutters in working order and clean?Yes
Comments

N/A

General cleanliness of Façade? - provide detailsGood
Comments

N/A

Lighting operational, (eg logo)?Yes
Comments

N/A

Windows clean?Yes
Comments

N/A

Door handles clean and tight?Yes
Comments

N/A

ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
- - - - - -
- - - - - -
- - - - - -
- - - - - -
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
- - - - - - -
Next Test Due in 3 months06/11/2019
Site Status SelectorPlease choose...
Technician's NameJoshua Bagetti
Store Manager's NameStore Manager