Which Company are you working for?Sturdie Trade Services
Which Trade are you working for?Electrical
StateVIC
Date of Visit08/07/2020
Technician's NameNathan McBain
Built Job Number46846
Swarovski Site in VICeastland
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (12 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 2 Y P
DB1 3 Y P
DB1 4 Y P
DB1 5 Y P
DB1 6 Y P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Is there an Emergency Light Test Facility & is it labelled properly?No
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 EM01 R Y Y Y P
EM02 R Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
N/A N/A Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?Yes
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?No
Comments

CRACKS IN PLASTER (BEING INVESTIGATED/QUOTED UNDER SERVICE JOB)
-REAR WALL 2M CRACK DOWN WALL FROM CEILING
-CEILING AT LIGHT FITTINGS REAR WALL 4.0M TO CEILING
-FRONT ENTRANCE AT END OF ROLLER SHUTTER TRACK 100MM CRACK 5MM WIDE 5.3M TO CEILING

Fixture draws able to open and close freely?No
Comments

WALL VITRINE CABINET BACK OF STORE RHS, DRAWERS NOT OPENING FREELY DUE TO CONSISTENTLY HITTING THE LED DRIVER.

Locks work on all fixtures?Yes
Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsGood
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsGood
Lighting operational, (eg logo)?Yes
Windows clean?Yes
Door handles clean and tight?Yes
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
CABINET PINE LIGHTS WALL VITRINE CABINET RHS 1 FAILED TO ILLUMINATE N N TBA TO BE REPLACED NEXT AUDIT ONCE DRIVER HAS BEEN SOURCED.
RECESSED SQUARE CEILING FITTING ABOVE REGISTER 1 FAILED TO ILLUMINATE N N TBA TO BE REPLACED NEXT AUDIT. 4.0M TO CEILING
EMERGENCY TEST FACILITY BOH DB1 1 NO EMERGENCY TEST FACILITY SWITCH INSTALLED N TBA TBA PLEASE ADVISE IF QUOTING IS REQUIRED
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?No
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE POWDER 2.5KG JUNE 2020 04/15 GREEN BOH Y
Next Test Due in 3 months08/01/2021
Site Status SelectorStore now fully compliant
Technician's NameNATHAN MCBAIN
Store Manager's NameNATALYA RAZOS