Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
Report any failures and provide costing to rectify (where applicable)
Is there an Emergency Light Test Facility & is it labelled properly?
No
Timers
Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
MAIN DB
EM01
R
Y
Y
Y
P
MAIN DB
EM02
R
Y
Y
Y
P
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
1
Y
Y
Y
P
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au
Yes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?
Yes
Are there any Warranty items needing to be repaired?
No
Paint & surfaces are clean?
No
Comments
POSSIBLE WATER DAMAGE ON CEILING NEAR LARGE DISPLAY WINDOW STAIN ROUGHLY 200MM WIDE (NORTH/WEST WINDOW) PICS ATTACHED
Fixture draws able to open and close freely?
Yes
Locks work on all fixtures?
Yes
Is there chips, dents or defects to joinery?
Yes
Comments
STAFF REPORTED THAT TRIM AROUND LARGE FRONT WINDOW TOP EDGE HAS NOT BEEN REPLACED SINCE IT CAME LOOSE. ADVISED STORE MANAGER, SCOTT, HAD IT REMOVED PERMANENTLY.
Is there damage to skirtings?
No
General cleanliness of fixtures, ceilings, P.O.S - provide details
Good
Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?
Yes
General cleanliness of Façade? - provide details
Good
Lighting operational, (eg logo)?
Yes
Windows clean?
Yes
Door handles clean and tight?
Yes
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
EMERGENCY TEST FACILITY
MAIN DB
1
NO TEST FACILITY INSTALLED
N
TBA
TBA
PLEASE ADVISE IF QUOTING IS REQUIRED
TEST AND TAG
STORE
20+
TEST AND TAG DUE 29/07/2020
N
N
Y
JOHN COWLES APPROVED TEST & TAGGING TO BE COMPLETED. TECH WILL ATTEND 17/07/2020.
General Works Checklist
Inspect all furniture and fittings for visible damage
Inspect all walls, ceilings, skirtings and floors for visible damage
Inspect storefront, façade and store LED logo for correct operations and visible damage
Inspect roller shutter and doors for correct operations and visible damage
Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?
Yes
General List of Repairs and additional works required
Defect Item
Location of Item
Details of Problem
Repaired on Site
Quote to be Sent
Comments
WINDOW TRIM
LARGE FRONT WINDOW (NORTH/WEST)
TRIM REMOVED
N
N
ADVISED STAFF THAT THE STORE MANAGER, SCOTT, ADVISED TO HAVE THESE TRIMS REMOVED.
Fire Extinguisher Details
Type (ABE Powder)
Size (4.5kg)
Last Test Date
Manufacture Date
Pressure Indicator (Green Zone)
Location In Store
Compliant (Y/N)
ABE POWDER
4.5KG
MARCH 2020
07/2016
GREEN
BOH
Y
Next Test Due in 3 months
10/01/2021
Site Status Selector
Completed but with repairs required
Technician's Name
Nathan McBain
Store Manager's Name
Amanda Cho
The Built Services Group seeks to apply innovation and technology for greater client services, business efficiencies and thinking Green.