Which Company are you working for?Sturdie Trade Services
Which Trade are you working for?Electrical
StateVIC
Date of Visit14/07/2020
Technician's NameNathan McBain
Built Job Number46850
Swarovski Site in VICemporium_melbourne
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (12 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
2 Y P
3 Y P
4 Y P
5 Y P
6 Y P
7 Y P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Is there an Emergency Light Test Facility & is it labelled properly?No
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 EM01 R Y Y Y P
DB1 EM02 R Y Y Y P
DB1 EM03 R Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
N/A N/A Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?Yes
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?No
Comments

GROUT MISSING BETWEEN TILES LENGTH OF STORE 8M.

Fixture draws able to open and close freely?No
Comments

VITRINE FLOOR CABINET NORTH SIDE OF STORE NEAREST FRONT, IS HARD TO OPEN. LOCKSMITH REQUIRED SOMETHING TO DO WITH LOCKING BRACKET MOUNTED TO SIDE OF TOP CABINET, TEMPORARILY REMOVED TO ALLOW DRAW TO OPEN/CLOSE FREELY LEFT LOCKING BRACKET WITH MANAGER/STAFF. COMPLETED UNDER SERVICE JOB# 50046.

Locks work on all fixtures?No
Comments

5 × VITRINE CABINETS HARD TO LOCK/ GETTING STUCK SOMETIMES.

Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsGood
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsGood
Lighting operational, (eg logo)?Yes
Windows clean?Yes
Door handles clean and tight?No
Comments

FRONT DOOR HANDLE LOOSE, TIGHTENED, NO FURTHER ACTION REQUIRED

ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
NO TEST FACILITY DB1 1 NO TEST FACILITY INSTALLED N TBA TBA PLEASE ADVISE IF QUOTE IS REQUIRED.
RECESSED SQUARE CEILING LIGHT FITTING SHOP FLOOR 6 FAILED TO ILLUMINATE N N TBA JOHN COWLES PUT REPAIRS ON HOLD UNTIL FURTHER NOTICE.
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
FIRE EXTINGUISHER BOH DUE FOR TESTING N N FIRE EXTINGUISHER TESTING WILL COMMENCE END OF JUL 2020 AS PER ADVISED BY JOHN COWLES.
FRONT DOOR HANDLE FRONT OF STORE LOOSE HANDLE Y N
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE POWDER 2.5KG OCT 2019 01/2014 GREEN BOH NEAR COMMS CABINET N
Next Test Due in 3 months14/01/2021
Site Status SelectorCompleted but with repairs required
Technician's NameNATHAN MCBAIN
Store Manager's NameJENNY LIN