Which Company are you working for?Sturdie Trade Services
Which Trade are you working for?Electrical
StateNSW
Date of Visit22/07/2020
Technician's NameCon Karakiozis
Built Job Number46680
Swarovski Site in NSWhomebush_dfo
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (12 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 1 Y P
2 Y P
3 Y P
4 Y P
5 Y P
6 Y P
7 Y P
8 Y P
9 Y P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Is there an Emergency Light Test Facility & is it labelled properly?Yes
Timers
  • Check timers for correct operation and timing
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?Yes
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?No
Comments

Chips and cracks on BOH wall and door.

Fixture draws able to open and close freely?Yes
Locks work on all fixtures?No
Comments

Fixture draw lock not work. Store has reported this to Head Office.

Is there chips, dents or defects to joinery?Yes
Comments

Most of the joinery units have chips or dents.

Is there damage to skirtings?Yes
Comments

60% of the skirting is damaged and peeling off. Screws have been put in place to hold skirt on. Problem re-occurs.

General cleanliness of fixtures, ceilings, P.O.S - provide detailsGood
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsGood
Lighting operational, (eg logo)?Yes
Windows clean?Yes
Door handles clean and tight?Yes
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Switchboard Cover Switchboard 1 Broken, needs to be replaced N N TBA Please advise if repairs are required.
Ceiling Lights Shop Floor 3 Not illuminated N N TBA Please advise if repairs are required.
LED Lights Shelving 1 Two shelves of LED lights are not illuminated N N TBA Please advise if repairs are required. Stock needs to be relocated.
Display Cabinet Shop Floor 1 Two shelves have 3 of the LED lights not working N N TBA Please advise if repairs are required.
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
Fire Extinguisher BOH Not compliant - overdue for testing N N To be tested late July/early August as per approval from John Cowles.
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE 4.5kg 09/2019 09/2018 Y BOH N
Next Test Due in 3 months22/01/2021
Site Status SelectorCompleted but with repairs required
Technician's NameCon Karakiozis
Store Manager's NameFlori Last