| Which Company are you working for? | Sturdie Trade Services |
|---|
| Which Trade are you working for? | Electrical |
|---|
| State | WA |
|---|
| Date of Visit | 15/01/2021 |
|---|
| Technician's Name | James Patterson |
|---|
| Built Job Number | 54365 |
|---|
| Swarovski in WA | booragoon |
|---|
| Test Period | 6 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| RCD Details (6 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| Tenancy 69 DB |
1 |
Y |
P |
N |
|
|
2 |
Y |
P |
N |
|
|
3 |
Y |
P |
N |
|
|
4 |
Y |
P |
N |
|
|
5 |
Y |
P |
N |
|
|
6 |
Y |
P |
N |
|
|
7 |
Y |
P |
N |
|
|
8 |
Y |
P |
N |
|
|
9 |
Y |
P |
N |
|
|
10 |
Y |
P |
N |
|
|
11 |
Y |
P |
N |
|
|
12 |
Y |
P |
N |
|
|
13 |
Y |
P |
N |
|
|
14 |
Y |
P |
N |
|
|
15 |
Y |
P |
N |
|
|
16 |
Y |
P |
N |
|
|
17 |
Y |
P |
N |
|
|
18 |
Y |
P |
N |
|
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
- Report any failures and provide costing to rectify (where applicable)
|
|---|
| Is there an Emergency Light Test Facility & is it labelled properly? | Yes |
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| Tenancy 69 DB |
1 |
R |
Y |
Y |
Y |
P |
|
|
|
|
2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| Tenancy 69 DB |
3 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
- Inspection of mobile & stationary electrical appliances
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au | Yes |
|---|
| If Yes, please upload all copies of legends here... (Limit of 6 megabytes total) | Swarovski-Booragoon-Switchboard-Legend.pdf |
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| Window Display Boxes - Is the Cabling in good conditions? | Yes |
|---|
| Are there any Warranty items needing to be repaired? | Yes |
|---|
| Paint & surfaces are clean? | No |
|---|
| Comments | Front of store has had water damage on ceiling. When it rains, it leaks.
Centre Management are aware. To be repaired by Shopping Centre
|
|---|
| Fixture draws able to open and close freely? | Yes |
|---|
| Locks work on all fixtures? | Yes |
|---|
| Is there chips, dents or defects to joinery? | No |
|---|
| Is there damage to skirtings? | No |
|---|
| General cleanliness of fixtures, ceilings, P.O.S - provide details | Good |
|---|
| Roller shutters in working order and clean? | Yes |
|---|
| Comments | Not Applicable
|
|---|
| General cleanliness of Façade? - provide details | Good |
|---|
| Lighting operational, (eg logo)? | No |
|---|
| Comments | 1 x 2by28w troffer was not illuminated at BOH. Has now been repaired on site.
|
|---|
| Windows clean? | Yes |
|---|
| Door handles clean and tight? | Yes |
|---|
| ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| 2by28w troffer |
BOH |
1 |
Not illuminated |
Y |
N |
N |
|
|
|---|
| Are there any repairs and additional works required? | Yes |
|---|
| General List of Repairs and additional works required | | Defect Item |
Location of Item |
Details of Problem |
Repaired on Site |
Quote to be Sent |
Comments |
| Front ceiling leak |
Front of store |
Water leak |
N |
N |
Centre Management to repair |
|
|---|
| Fire Extinguisher Details | | Type (ABE Powder) |
Size (4.5kg) |
Last Test Date |
Manufacture Date |
Pressure Indicator (Green Zone) |
Location In Store |
Compliant (Y/N) |
| ABE Powder |
2.5kg |
July 2020 |
October 2018 |
Green Zone (11 Bar) |
BOH |
N - To be serviced between 15/01/21 - 29/01/21 |
|
|---|
| Next Test Due in 3 months | 15/07/2021 |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Technician's Name | James Patterson |
|---|
| Store Manager's Name | Alyshia Harrison |
|---|
| |
|---|
| |