Which Company are you working for?Sturdie Trade Services
Which Trade are you working for?Electrical
StateVIC
Date of Visit27/10/2021
Technician's NameNathan McBain
Built Job Number57750
Swarovski Site in VIChighpoint
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
MAIN DB 02 Y P
MAIN DB 03 Y P
MAIN DB 05 Y P
MAIN DB 06 Y P
MAIN DB 07 Y P
MAIN DB 08 Y P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Is there an Emergency Light Test Facility & is it labelled properly?Yes
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
MAIN DB EM01 R Y Y Y P
MAIN DB EM02 R Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
MAIN DB EX01 Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
  • Inspection of mobile & stationary electrical appliances
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?Yes
Are there any Warranty items needing to be repaired?No
Paint & surfaces are clean?No
Comments

BUILD UP OF BUGS/DUST BEHIND FRONT SIGN, NOT ACCESSIBLE. PHOTO ATTACHED.

Fixture draws able to open and close freely?Yes
Locks work on all fixtures?Yes
Is there chips, dents or defects to joinery?No
Is there damage to skirtings?No
General cleanliness of fixtures, ceilings, P.O.S - provide detailsGood
Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
  • Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?Yes
General cleanliness of Façade? - provide detailsGood
Lighting operational, (eg logo)?No
Comments

SWAN LOGO BEHIND COUNTER FAILED TO ILLUMINATE.

Windows clean?Yes
Door handles clean and tight?Yes
Comments

TIGHTENED AND LUBRICATED HINGE AS IT WAS SQUEAKY

ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
TEST AND TAG STORE 10-15 TEST AND TAG IN DATE NEXT TEST DUE 24_03_2022 N N N OBSERVATION
SWAN LOGO LIGHT BEHIND COUNTER 2 FAILED TO ILLUMINATE 50% N TBA TBA DRIVER REQUIRES REPLACING. HOWEVER MANAGER ADVISED SIGN MAY BE GETTING REPLACED. PLEASE ADVISE IF STURDIE ARE TO PROCEED WITH REPAIRS FOR SIGN
FIRE EXTINGUISHER BOH 1 EXISTING LOCATION, EXTINGUISHER MOUNTED TOO HIGH, NO TYPE SIGN OR LOCATION SIGN INSTALLED N N Y RELOCATED FIRE EXTINGUISHER TO CORRECT HEIGHT, ORDER AND REPLACE TYPE SIGN AND LOCATION SIGN, ONCE COMPLETED FIRE EXTINGUISHER CAN BE CERTIFIED. WORKS TO BE CARRIED OUT ON TRACKING 191030071
DYSON VACUUM BOH 1 NO BRACKET INSTALLED Y N N INSTALLED DYSON WALL BRACKET WHILE ONSITE
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, note compliance date
Are there any repairs and additional works required?No
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE POWDER 2.5KG AUG 21 OCT-2019 GREEN BOH N
Next Test Due in 3 months27/05/2022
Site Status SelectorCompleted but with repairs required
Technician's NameNATHAN MCBAIN
Store Manager's NameNatae Aberle