| Which Company are you working for? | Sturdie Trade Services |
|---|
| Which Trade are you working for? | Electrical |
|---|
| State | VIC |
|---|
| Date of Visit | 12/11/2021 |
|---|
| Technician's Name | Nathan McBain |
|---|
| Built Job Number | 57751 |
|---|
| Swarovski Site in VIC | northland |
|---|
| Test Period | 6 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| RCD Details (6 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB1 |
4-5 |
Y |
P |
|
|
| DB1 |
6-7 |
Y |
P |
|
|
| DB1 |
8 |
Y |
P |
|
|
| DB1 |
9 |
Y |
P |
|
|
| DB1 |
13 |
Y |
P |
|
|
| DB1 |
14 |
Y |
P |
|
|
| DB1 |
17 |
Y |
P |
|
|
| DB1 |
18 |
Y |
P |
|
|
| DB1 |
19 |
Y |
P |
|
|
| DB1 |
23-24 |
Y |
P |
|
|
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
- Report any failures and provide costing to rectify (where applicable)
|
|---|
| Is there an Emergency Light Test Facility & is it labelled properly? | Yes |
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
EM01 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM02 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM03 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EM04 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
EX01 |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
EX02 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
- Inspection of mobile & stationary electrical appliances
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au | Yes |
|---|
| If Yes, please upload all copies of legends here... (Limit of 6 megabytes total) |  |
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| Window Display Boxes - Is the Cabling in good conditions? | Yes |
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| Paint & surfaces are clean? | No |
|---|
| Comments | CRACKS IN CEILING PLASTER AS REPORTED
|
|---|
| Fixture draws able to open and close freely? | Yes |
|---|
| Locks work on all fixtures? | Yes |
|---|
| Is there chips, dents or defects to joinery? | No |
|---|
| Is there damage to skirtings? | No |
|---|
| General cleanliness of fixtures, ceilings, P.O.S - provide details | Good |
|---|
| Any issues found onsite please take photos and upload here | |
|---|
| Roller shutters in working order and clean? | Yes |
|---|
| General cleanliness of Façade? - provide details | Good |
|---|
| Lighting operational, (eg logo)? | No |
|---|
| Comments | FRONT SIGN SOUTH SIDE DIM AS REPORTED FACING PROUDS
|
|---|
| Windows clean? | Yes |
|---|
| Door handles clean and tight? | No |
|---|
| Comments | EAST SIDE ENTRY HANDLE LOOSE, TIGHTEN WHILE ONSITE
|
|---|
| ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| TEST AND TAG |
STORE |
15+ |
TEST AND TAG INDATE, NEXT TEST DUE 26_01_22 |
N |
N |
N |
OBSERVATION |
| PINE LIGHTS |
CENTER OF SHOP SMALL CABINET EAST |
2 |
FAILED TO ILLUMINATE |
N |
TBA |
TBA |
PINE LIGHTS AND DRIVERS REQUIRE REPLACING. PLEASE ADVISE IF STURDIE ARE TO PROVIDE A QUOTE. |
| PINE LIGHTS |
PHONE COVERS SOUTH |
2 |
FAILED TO ILLUMINATE |
N |
TBA |
TBA |
PINE LIGHTS AND DRIVERS REQUIRE REPLACING. PLEASE ADVISE IF STURDIE ARE TO PROVIDE A QUOTE. |
| PINE LIGHTS |
CABINET NEXT TO PHONE COVERS SOUTH |
2 |
FAILED TO ILLUMINATE |
N |
TBA |
TBA |
PINE LIGHTS AND DRIVERS REQUIRE REPLACING. PLEASE ADVISE IF STURDIE ARE TO PROVIDE A QUOTE. |
| PINE LIGHTS |
CENTER OF SHOP LARGE CABINET |
4 |
FAILED TO ILLUMINATE/FLICKERING |
N |
TBA |
TBA |
4 × PINE LIGHTS AND 2 × DRIVERS REQUIRE REPLACING AS THE LIGHTS ARE FLICKERING. PLEASE ADVISE IF STURDIE ARE TO PROVIDE A QUOTE. |
| SWAROVSKI SIGN |
FRONT OF STORE SOUTH |
1 |
THE SWAN, V AND I IS ILLUMINATED HOWEVER THE REST OF THE SIGN IS VERY DIM |
N |
TBA |
TBA |
SIGN WILL REQUIRE REPLACING. PLEASE ADVISE IF STURDIE ARE TO PROVIDE A QUOTE. |
| CRACKS IN CEILING |
AROUND SPRINKLER HEAD AND AROUND LIGHTS NEAR AIR CONDITIONING VENTS, NEAR POS |
2 |
CRACKS IN PLASTER |
N |
TBA |
TBA |
OBSERVATION |
| PINE LIGHTS |
NEAR ENTRY EAST SIDE |
2 |
FAILED TO ILLUMINATE |
N |
TBA |
TBA |
PINE LIGHTS AND DRIVER REQUIRES REPLACING. PLEASE ADVISE IF STURDIE ARE TO PROVIDE A QUOTE. |
|
|---|
| General Works Checklist | - Inspect all furniture and fittings for visible damage
- Inspect all walls, ceilings, skirtings and floors for visible damage
- Inspect storefront, façade and store LED logo for correct operations and visible damage
- Inspect roller shutter and doors for correct operations and visible damage
- Check fire extinguishers, note compliance date
|
|---|
| Are there any repairs and additional works required? | No |
|---|
| Fire Extinguisher Details | | Type (ABE Powder) |
Size (4.5kg) |
Last Test Date |
Manufacture Date |
Pressure Indicator (Green Zone) |
Location In Store |
Compliant (Y/N) |
| ABE POWDER |
2.5KG |
NOV 21 |
10/2019 |
GREEN |
BOH |
Y |
|
|---|
| Next Test Due in 3 months | 12/05/2022 |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Technician's Name | NATHAN MCBAIN |
|---|
| Store Manager's Name | Nick H |
|---|
| |
|---|
| |