Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
Report any failures and provide costing to rectify (where applicable)
Is there an Emergency Light Test Facility & is it labelled properly?
Yes
Timers
Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB1
EM01
R
Y
Y
Y
P
DB1
EM02
R
Y
Y
Y
P
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
N/A
Y
Y
Y
P
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
Inspection of mobile & stationary electrical appliances
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au
Yes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
Window Display Boxes - Is the Cabling in good conditions?
Yes
Are there any Warranty items needing to be repaired?
No
Paint & surfaces are clean?
Yes
Fixture draws able to open and close freely?
Yes
Locks work on all fixtures?
Yes
Is there chips, dents or defects to joinery?
Yes
Comments
GLASS TOPPED FLOOR DISPLAY UNDER VISUAL DISPLAY SHOP FLOOR BACK WALL. SIDE GLASS HAS COME LOOSE DURING CLEANING, REMOVED TOP FOR SAFETY REASON, GLAZIER REQUIRED. TOP AND SIDE PANELS PLACED BOH IN CORNER OF RACKING.
Is there damage to skirtings?
No
General cleanliness of fixtures, ceilings, P.O.S - provide details
Good
Any issues found onsite please take photos and upload here
Roller shutters in working order and clean?
Yes
General cleanliness of Façade? - provide details
Good
Lighting operational, (eg logo)?
Yes
Windows clean?
Yes
Door handles clean and tight?
Yes
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
TEST AND TAG
STORE
20+
TEST AND TAG INDATE, NEXT TEST DUE 15/02/2023
N
N
N
OBSERVATION
GLASS DISPLAY CABINET
BACK OF SHOP FLOOR UNDER VISUAL DISPLAY
1
SIDE GLASS PANELS HAVE DROPPED OUT DURING CLEANING
N
N
Y
GLAZIER REQUIRED AS SOON AS POSSIBLE
General Works Checklist
Inspect all furniture and fittings for visible damage
Inspect all walls, ceilings, skirtings and floors for visible damage
Inspect storefront, façade and store LED logo for correct operations and visible damage
Inspect roller shutter and doors for correct operations and visible damage
Check fire extinguishers, note compliance date
Are there any repairs and additional works required?
No
Fire Extinguisher Details
Type (ABE Powder)
Size (4.5kg)
Last Test Date
Manufacture Date
Pressure Indicator (Green Zone)
Location In Store
Compliant (Y/N)
ABE POWDER
2.5KG
MAY 2022
JUNE 2018
GREEN
BOH
Y
Next Test Due in 3 months
05/11/2022
Site Status Selector
Store now fully compliant
Technician's Name
NATHAN MCBAIN
Store Manager's Name
Lara Decendranath