Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateVIC
Date of Visit01/06/2017
Technician's NameJoe Chetcuti
Built Job Number23795
Swarovski Site in VICessendon_airport_dfo
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
db1 1 y p
2 y p
3 y p
4 y p
5 y p
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
db1 1 s y n y f failed on battery, need sizzor to replace n n
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
db1 1 y y y p
2 y n n f failed on battery n n
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
em 1 failed near registers 1 failed 90 min test n y n Need vertical lift, works must be done before stores in DFO open so you can drive vertical telescopic lift in and out with out pedestrians, 1 x surface mount fitting required
store room light store room wall 1 exposed wiring, ohs concern y n n Completed
spot light mounted to track lighting 1 failed to illuminate n y n Requires new 35w globe
1 x 400w high bay near registers 1 failed to illuminate n y n Requires vertical lift and new fitting. Must be completed before trading hours of complex
20w globes out under cabinets near registers 2 failed to illuminate n y n Requires two globes but possibly could be the transformers
mini opticle fibre spot lights 11 cases 11 failed to illuminate n y n Replacement of opticle fibre boxes
extention lead across floor powering fridge in BOH 1 ohs concern n y n Install new gpo , tps x 15m, feed from switch
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?No
Next Test Due in 3 months01/09/2017
Site Status SelectorStore now fully compliant
Technician's Namejoe chetcuti
Store Manager's Namemana dakic