Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit20/06/2017
Technician's NameShane Hamilton
Built Job Number23785
Swarovski Site in NSWshellharbour
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB 1 Y P
2 Y P
3 Y P
4 Y P
5 Y P
6 Y P
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB Showroom R Y Y Y P
BOH R Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB Showroom Y Y Y P
BOH Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
9 x spot LED rail Wall showcases 4 Faulty LED N Y Y 9 Spot Schott Spectra LED spot
3 x spot LED rail Crystal column in shopfront 18 Faulty LED N Y Y 3 Spot Schott Crystal Strands 144mm
Center island displays Showroom 3 Paint chips N N N John, please confirm if repairs are required
Center glass island displays Showroom 1 Missing Swarovski sticker N N N John, please confirm if repairs are required
Cracked ceiling Showroom shopfront 2 Cracked at edge of airconditioning register N N N John, please confirm if repairs are required
Ceiling tiles BOH 5 Water damage N N N John, please confirm if repairs are required
Fire extinguisher 3.5 kg Carbon Dioxide BOH 1 01/2012 over 5 years N N N Tag inspection date March 2017. John, please confirm if replacement required
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?No
Next Test Due in 3 months20/09/2017
Site Status SelectorStore now fully compliant
Technician's NameShane Hamilton
Store Manager's NameJulie Bourke