Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit26/06/2017
Technician's NameRaphael Melas
Built Job Number23785
Swarovski Site in NSWwarringah_mall
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
db1 1 y p n n
2 y p n n
3 y p n n
4 y p n n
5 y p n n
6 y p n n
7 y p n n
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
db1 em1 r y y y p n n n
em2 r y y y p n n n
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
exit lighting shop floor non existant n y
fire extinguisher shop floor non existant n n Upon approval from John, technician attended site and installed a fire extinguisher
un even cabinets shop floor un even cabinets n n John, please confirm if repairs are required
unstuck glass low level cabinets glass is unstuck and moving n n John, please confirm if repairs are required
scratched cabints low level cabinets scratches on cabinets n n John, please confirm if repairs are required
no handle rear door no handle fitted n n John, please confirm if repairs are required
door hinges low level cabinets door hinges dropped and doors are not closing n n John, please confirm if repairs are required
Next Test Due in 3 months26/09/2017
Site Status SelectorStore now fully compliant
Technician's Nameraphael melas
Store Manager's Namejames moharram