Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateACT
Date of Visit19/09/2017
Technician's NameDominic Dowdy
Built Job Number25817
Swarovski Site in ACTcanberra_popup
Test Period9 Monthly (90minutes)
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auNo
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?No
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
A:B(E) 4.5kg AUG 01/17 Green zone Inside store room door Y
Next Test Due in 3 months19/12/2017
Site Status SelectorStore now fully compliant
Technician's NameDominic Dowdy
Store Manager's NameNadiza Stepiz