Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateSA
Date of Visit20/09/2017
Technician's NameDaniel Moio
Built Job Number25904
Swarovski Site in SAmarion
Test Period9 Monthly (90minutes)
General Checklist
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Lighting Shop floor 1 No illumination y n n
Switchboard Store room 1 No access n n n No access to switchboard. things will have to be moved around
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
Ceiling Shop floor Cracked n n Cracked ceiling around light. John, please confirm if repairs are required
Lighting 2 x Display cabinets Globes faulty in strip lighting n n 1 globe faulty in each 9 x light strip lighting. John, please confirm if repairs are required
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE powder 2.5 March 2012 05/2011 1400 (normal) Store n
Next Test Due in 3 months20/12/2017
Site Status SelectorStore now fully compliant
Technician's NameDanny Moio
Store Manager's Nameangela clark