| Which Company are you working for? | Built Electrical |
|---|
| Which Trade are you working for? | Electrical |
|---|
| State | VIC |
|---|
| Date of Visit | 21/09/2017 |
|---|
| Technician's Name | Jeremy Ware |
|---|
| Built Job Number | 25804 |
|---|
| Swarovski Site in VIC | essendon_airport_dfo |
|---|
| Test Period | 9 Monthly (90minutes) |
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au | No |
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| General Works Checklist | - Inspect all furniture and fittings for visible damage
- Inspect all walls, ceilings, skirtings and floors for visible damage
- Inspect storefront, façade and store LED logo for correct operations and visible damage
- Inspect roller shutter and doors for correct operations and visible damage
- Check fire extinguishers, update compliance tags/labels
|
|---|
| Are there any repairs and additional works required? | No |
|---|
| Fire Extinguisher Details | | Type (ABE Powder) |
Size (4.5kg) |
Last Test Date |
Manufacture Date |
Pressure Indicator (Green Zone) |
Location In Store |
Compliant (Y/N) |
| POWDER 3A:40B:E |
2.5KG |
SEPT. 2017 |
11/12/2011 |
1400 GREEN |
STOREROOM |
Y |
|
|---|
| Next Test Due in 3 months | 21/12/2017 |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Technician's Name | Jeremy Ware |
|---|
| Store Manager's Name | SIMGE YUKSEL |
|---|
| |
|---|
| |