Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNEW ZEALAND
Date of Visit05/10/2017
Technician's NameKurt Sorensen
Built Job Number25915
Swarovski Site in New Zealandalbany
Test Period9 Monthly (90minutes)
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)Albany.pdf
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
Are there any repairs and additional works required?No
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
BC - Dry Chemical 1 kg Not tested/stamped 08/13 1344kpa Store Room N
Next Test Due in 3 months05/01/2018
Site Status SelectorStore now fully compliant
Technician's NameKurt Sorensen
Store Manager's NameElena Ahn