Which Company are you working for?Built Electrical QLD
Which Trade are you working for?Electrical
StateQLD
Date of Visit06/10/2017
Technician's NameRyan Lusted
Built Job Number25819
Swarovski Site in QLDpacific_fair
Test Period9 Monthly (90minutes)
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auNo
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Crystal light column FOH 16 x spotlights LED lights out N N N John please confirm if repairs are required
Crystal light column FOH 9 x blocks of 3 lights Led lights out N N N John please confirm if repairs are required
GPO BOH 1 Missing cover Y N N
Lights FOH All Colour change N N N John please confirm if repairs are required
Thermostat Storeroom 1 Temperature variance N N N John please confirm if repairs are required
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
Plaster FOH - square column Cracked N N John please confirm if repairs are required
External locks Display cupboards Not locking properly N N John please confirm if repairs are required
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
Dry Powder 4.5kg Jul 2017 03/2012 Green BOH Y
Next Test Due in 3 months06/01/2018
Site Status SelectorStore now fully compliant
Technician's NameRyan Lusted
Store Manager's NameJan Biles