Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateSA
Date of Visit06/02/2018
Technician's NameDaniel Moio
Built Job Number28088
Swarovski Site in SAadelaide
Test Period12 Monthly (90 minutes)
RCD Details (12 Month)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB G2B R1 Y 82 82 P
W1 Y - - P All cabinetry lights were hardwired so was unable to carry out an RCD test. Push button test passed.
B1 Y 74 74 p
R3 Y 92 85 p
W3 Y 42 42 p
W7 Y 30 30 p
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB G2B R Y Y Y P
R Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB G2B Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Emergency Logbook Back of House 1 Missing N N N Not provided at time of re-fit. Swarovski to obtain from Builder.
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
Cupboard Lock Back NE corner Key snapped off in lock N N John, please advise if repairs are required.
Cupboard Lock RHS Front Desk Latch is too long (it hits on display above so it doesn't rotate enough before jamming). Key unable to be removed. N N John, please advise if repairs are required.
Shelving in Back of House Back of House Pins that hold the shelving fall out causing stock to fall. N N John, please advise if repairs are required.
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE Powder 4.5 September 2017 07/17 Y Back of House Y
Next Test Due in 3 months06/08/2018
Site Status SelectorStore now fully compliant
Technician's NameDanny Moio
Store Manager's Nameivana milosevic