| Which Company are you working for? | Built Electrical |
|---|
| Which Trade are you working for? | Electrical |
|---|
| State | NSW |
|---|
| Date of Visit | 28/02/2018 |
|---|
| Technician's Name | Matthew Mullins |
|---|
| Built Job Number | 28084 |
|---|
| Swarovski Site in NSW | warringah_mall |
|---|
| Test Period | 6 Monthly (90 minutes) |
|---|
| RCD Details (12 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB1 |
1 |
Y |
30 |
19 |
P |
|
|
| DB1 |
2 |
Y |
29 |
19 |
P |
|
|
| DB1 |
3 |
Y |
29 |
19 |
P |
|
|
| DB1 |
4 |
Y |
29 |
19 |
P |
|
|
| DB1 |
5 |
Y |
29 |
19 |
P |
|
|
| DB1 |
6 |
Y |
29 |
19 |
P |
|
|
| DB1 |
7 |
Y |
27 |
25 |
P |
|
|
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
- Report any failures and provide costing to rectify (where applicable)
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB1 |
em1 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB1 |
em2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au | Yes |
|---|
| If Yes, please upload all copies of legends here... (Limit of 6 megabytes total) |  |
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| General Works Checklist | - Inspect all furniture and fittings for visible damage
- Inspect all walls, ceilings, skirtings and floors for visible damage
- Inspect storefront, façade and store LED logo for correct operations and visible damage
- Inspect roller shutter and doors for correct operations and visible damage
- Check fire extinguishers, update compliance tags/labels
|
|---|
| Are there any repairs and additional works required? | No |
|---|
| General List of Repairs and additional works required | | Defect Item |
Location of Item |
Details of Problem |
Repaired on Site |
Quote to be Sent |
Comments |
| Mirror panels |
Throughout store, on the sides of the display cabinets |
Double sided tape has come free and the staff have "blu-tak" the panel back in place |
N |
N |
John, please confirm if repairs are required |
|
|---|
| Fire Extinguisher Details | | Type (ABE Powder) |
Size (4.5kg) |
Last Test Date |
Manufacture Date |
Pressure Indicator (Green Zone) |
Location In Store |
Compliant (Y/N) |
| ABE |
4.5kg |
6/2017 |
3/2017 |
Y |
Store room directly beside door |
N |
|
|---|
| Next Test Due in 3 months | 28/05/2018 |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Technician's Name | Matthew Mullins |
|---|
| Store Manager's Name | Norris Xie |
|---|
| |
|---|
| |