Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit01/03/2018
Technician's NameMatthew Mullins
Built Job Number28084
Swarovski Site in NSWmacquarie_centre
Test Period12 Monthly (90 minutes)
RCD Details (12 Month)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
2238A 2 Y 29 18 P N
2238A 3 Y 29 18 P N
2238A 4 Y 28 17 P N
2238A 5 Y 29 20 P N
2238A 6 Y 18 29 P N
2238A 7 Y 29 19 P N
2238A 8 Y 28 19 P N
2238A 9 Y 28 17 P N
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
2238A S1 R Y Y Y P N
2238A S2 R Y Y Y P N
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
2238A Ex1 Y Y Y P N
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
2 sets of Drawers roller and locks 3 level drawers under light box displays Won't lock and drawers fall off rollers N N John, please confirm if repairs are required
Cabinet locks All over store Can be difficult to open, locks move in fixing N N John, please confirm if repairs are required
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE 4.5kg 1/2018 6/2014 Y Store room on right of door as you walk in Y
Next Test Due in 3 months01/06/2018
Site Status SelectorStore now fully compliant
Technician's NameMatthew Mullins
Store Manager's NameMeli Hidayat