| Which Company are you working for? | Built Electrical |
|---|
| Which Trade are you working for? | Electrical |
|---|
| State | WA |
|---|
| Date of Visit | 21/03/2018 |
|---|
| Technician's Name | Adam Hoes |
|---|
| Built Job Number | 28089 |
|---|
| Swarovski in WA | booragoon |
|---|
| Test Period | 12 Monthly (90 minutes) |
|---|
| RCD Details (12 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB 01 |
01 |
Y |
Spare |
Spare |
P |
|
|
|
02 |
Y |
Spare |
Spare |
P |
|
|
|
03 |
Y |
Spare |
Spare |
P |
|
|
|
04 |
Y |
Spare |
Spare |
P |
|
|
|
05 |
Y |
Spare |
Spare |
P |
|
|
|
06 |
Y |
Spare |
Spare |
P |
|
|
|
07 |
Y |
Spare |
Spare |
P |
|
|
|
08 |
Y |
Spare |
Spare |
P |
|
|
|
09 |
Y |
.17 |
.18 |
P |
|
|
|
10 |
Y |
.09 |
.08 |
P |
|
|
|
11 |
Y |
.21 |
.17 |
P |
|
|
|
12 |
Y |
.16 |
.15 |
P |
|
|
|
13 |
Y |
.15 |
.16 |
P |
|
|
|
14 |
Y |
.12 |
.12 |
P |
|
|
|
15 |
Y |
.22 |
.19 |
P |
|
|
|
16 |
Y |
.08 |
.09 |
P |
|
|
|
17 |
Y |
.04 |
.06 |
P |
|
|
|
18 |
Y |
.10 |
.11 |
P |
|
|
|
19 |
Not RCD |
Not RCD |
Not RCD |
Not RCD |
|
|
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
- Report any failures and provide costing to rectify (where applicable)
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 02 |
02 |
R |
Y |
Y |
Y |
P |
|
|
|
|
03 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 01 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.au | Yes |
|---|
| If Yes, please upload all copies of legends here... (Limit of 6 megabytes total) |  |
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Emergency Test Switch |
Main DB |
1 |
None installed |
N |
Y |
TBA |
Quote to be sent for approval. |
|
|---|
| General Works Checklist | - Inspect all furniture and fittings for visible damage
- Inspect all walls, ceilings, skirtings and floors for visible damage
- Inspect storefront, façade and store LED logo for correct operations and visible damage
- Inspect roller shutter and doors for correct operations and visible damage
- Check fire extinguishers, update compliance tags/labels
|
|---|
| Are there any repairs and additional works required? | Yes |
|---|
| General List of Repairs and additional works required | | Defect Item |
Location of Item |
Details of Problem |
Repaired on Site |
Quote to be Sent |
Comments |
| Ottaman |
Shop Floor |
Missing Crystals |
N |
N |
Replacement required. |
|
|---|
| Fire Extinguisher Details | | Type (ABE Powder) |
Size (4.5kg) |
Last Test Date |
Manufacture Date |
Pressure Indicator (Green Zone) |
Location In Store |
Compliant (Y/N) |
| ABE Powder |
2.5kg |
09/2017 |
04/2012 |
Green Zone |
Back of House |
Y |
|
|---|
| Next Test Due in 3 months | 21/06/2018 |
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Technician's Name | Adam Hoes |
|---|
| Store Manager's Name | Jennifer Ellis |
|---|
| |
|---|
| |