Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateWA
Date of Visit29/03/2018
Technician's NameAdam Hoes
Built Job Number28089
Swarovski in WAcarousel
Test Period12 Monthly (90 minutes)
RCD Details (12 Month)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB01 03 Y .06 .05 F Eaton product recall N
05 Y .08 .08 F Eaton product recall N
07 Y .09 .12 F Eaton product recall N
09 Y .10 .14 F Eaton product recall N
11 Y .11 .13 F Eaton product recall N
02 Y .10 .12 P
04 Y .04 .03 F Eaton product recall N
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 or 120 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicatior functions correctly
  • Report any failures and provide costing to rectify (where applicable)
Timers
  • Check timers for correct operation and timing
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 01 02 R Y Y Y P
04 R Y Y Y P
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
01 Y N Y F Failed 90 Min Test Y N
04 Y Y Y P
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Eaton Breakers Site Switchboard 5x 10amp, 1x 20amp Recalled product N N TBA Built to source replacement parts. We will advise when complete.
Emergency Test Switch Below Switchboard 1 Requires time delay switch N Y TBA Quote to be sent for approval.
GPO Below Switchboard 1 Requires installation, store using double adapter N Y TBA Quote to be sent for approval.
Exit Light Entry Door - 01 1 Failed 90 Min Test Y N N
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
1 x 7 Spot Rail Window Box Spectra LED Spot 7 Lamp out N N John, please advise if repairs are required.
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE Powder 4.2kg 2012 04/12 Green Zone Back of store N - out of date and never been tested.
Next Test Due in 3 months29/06/2018
Site Status SelectorCompleted but with repairs required
Technician's Nameadam hoes
Store Manager's NameJennifer grabowski