Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateSA
Date of Visit01/05/2018
Technician's NameDaniel Moio
Built Job Number30448
Swarovski Site in SAadelaide
Test Period3 Monthly (90 minutes)
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
Fire Extinguisher Showroom Not compliant, testing is overdue N N John, please confirm if testing is required
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
ABE POWDER 4.5kg Sep 2017 07/17 Green Store room N
Next Test Due in 3 months01/08/2018
Site Status SelectorStore now fully compliant
Technician's NameDanny Moio
Store Manager's NameIvana Milosevic