Which Company are you working for?Built Electrical
Which Trade are you working for?Electrical
StateNSW
Date of Visit02/05/2018
Technician's NameMatthew Mullins
Built Job Number30449
Swarovski Site in NSWqueen_victoria_building
General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
Are there accurate switchboard legends within each switchboard? Please take a photo send with report to epm@builtelectrical.com.auYes
If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)If Yes, please upload all copies of legends here... (Limit of 6 megabytes total)
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
Are there any Warranty items needing to be repaired?No
ELECTRICAL LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Window material lightbox display In shop window 1 Top half of display is not illuminated. N N TBA Repairs approved by John 8/5/18. To be scheduled as soon as possible.
Watches vetreen On left as you walk in 1 LED lights not on, no power feeding LED drivers. N N TBA Repairs approved by John 8/5/18. To be scheduled as soon as possible.
General Works Checklist
  • Inspect all furniture and fittings for visible damage
  • Inspect all walls, ceilings, skirtings and floors for visible damage
  • Inspect storefront, façade and store LED logo for correct operations and visible damage
  • Inspect roller shutter and doors for correct operations and visible damage
  • Check fire extinguishers, update compliance tags/labels
Are there any repairs and additional works required?Yes
General List of Repairs and additional works required
Defect Item Location of Item Details of Problem Repaired on Site Quote to be Sent Comments
C02 Fire Extinguisher Storeroom Not compliant - testing overdue N N Repairs approved by John 24/5/18. To be scheduled as soon as possible.
Fire Extinguisher Details
Type (ABE Powder) Size (4.5kg) Last Test Date Manufacture Date Pressure Indicator (Green Zone) Location In Store Compliant (Y/N)
C02 2.0kg 8/17 8/15 NA Storeoom, opposite base of stairs N
Next Test Due in 3 months01/08/2018
Site Status SelectorCompleted but with repairs required
Technician's NameMatthew Mullins
Store Manager's NameJoey Xue