State | NSW |
---|
Date of Visit | 13/10/2020 |
---|
Technician's Name | Mitch Cutts |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50953 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | maitland_east |
---|
|
|
---|
Location Name | Maitland East |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
2 |
Y |
.008 |
.016 |
P |
|
|
|
4 |
Y |
.016 |
.023 |
P |
|
|
|
6 |
Y |
.028 |
.022 |
P |
|
|
|
8 |
Y |
.030 |
.029 |
P |
|
|
|
10 |
Y |
.025 |
.022 |
P |
|
|
|
14 |
Y |
.035 |
.029 |
P |
|
|
|
28 |
Y |
.042 |
.029 |
P |
|
|
|
30 |
Y |
.027 |
.021 |
P |
|
|
|
32 |
Y |
.024 |
.020 |
P |
|
|
|
34 |
Y |
.038 |
.033 |
P |
|
|
|
36 |
Y |
.029 |
.022 |
P |
|
|
|
38 |
Y |
.024 |
.018 |
P |
|
|
|
40 |
Y |
.024 |
.018 |
P |
|
|
|
42 |
Y |
.032 |
.028 |
P |
|
|
|
44 |
Y |
.023 |
.017 |
P |
|
|
|
46 |
Y |
.030 |
.026 |
P |
|
|
|
48 |
Y |
.029 |
.025 |
P |
|
|
|
54 |
Y |
.035 |
.026 |
P |
|
|
|
56 |
Y |
.029 |
.020 |
P |
|
|
|
58 |
Y |
.025 |
.020 |
P |
|
|
DB2 |
2 |
Y |
.034 |
.031 |
P |
|
|
|
4 |
Y |
.028 |
.019 |
P |
|
|
|
6 |
Y |
.026 |
.017 |
P |
|
|
|
8 |
Y |
.029 |
.023 |
P |
|
|
|
38 |
Y |
.025 |
.019 |
P |
|
|
|
39 |
Y |
.022 |
.016 |
P |
|
|
|
40 |
Y |
.008 |
.013 |
P |
|
|
|
41 |
Y |
.029 |
.022 |
P |
|
|
|
42 |
Y |
.028 |
.023 |
P |
|
|
|
43 |
Y |
.034 |
.027 |
P |
|
|
|
45 |
Y |
.023 |
.021 |
P |
|
|
|
47 |
Y |
.008 |
.018 |
P |
|
|
|
49 |
Y |
.019 |
.013 |
P |
|
|
DB3 |
5 |
Y |
.022 |
.018 |
P |
|
|
|
7 |
Y |
.010 |
.018 |
P |
|
|
|
8 |
Y |
.008 |
.016 |
P |
|
|
|
9 |
Y |
.026 |
.020 |
P |
|
|
|
11 |
Y |
.024 |
.017 |
F |
Failed trip test |
Y |
|
12 |
Y |
.035 |
.028 |
P |
|
|
|
13 |
Y |
.008 |
.018 |
P |
|
|
|
14 |
Y |
.023 |
.016 |
P |
|
|
|
16 |
Y |
.016 |
.019 |
P |
|
|
|
18 |
Y |
.029 |
.022 |
P |
|
|
|
21 |
Y |
.030 |
.033 |
P |
|
|
|
25 |
Y |
.027 |
.019 |
P |
|
|
|
33 |
Y |
.021 |
.019 |
P |
|
|
DB4 |
1 |
Y |
.031 |
.041 |
P |
|
|
|
2 |
Y |
.029 |
.020 |
P |
|
|
|
3 |
Y |
.029 |
.019 |
P |
|
|
|
4 |
Y |
.033 |
.026 |
P |
|
|
|
5 |
Y |
.045 |
.033 |
P |
|
|
|
6 |
Y |
.028 |
.019 |
P |
|
|
|
7 |
Y |
.027 |
.024 |
P |
|
|
|
8 |
Y |
.030 |
.018 |
P |
|
|
|
9 |
Y |
.033 |
.024 |
P |
|
|
|
10 |
Y |
.023 |
.019 |
P |
|
|
|
11 |
Y |
.036 |
.031 |
P |
|
|
|
12 |
Y |
.039 |
.037 |
P |
|
|
|
13 |
Y |
.023 |
.019 |
P |
|
|
|
14 |
Y |
.022 |
.016 |
P |
|
|
|
15 |
Y |
.008 |
.016 |
P |
|
|
|
16 |
Y |
.020 |
.016 |
P |
|
|
|
17 |
Y |
.036 |
.028 |
P |
|
|
|
19 |
Y |
.045 |
.029 |
P |
|
|
|
21 |
Y |
.038 |
.030 |
P |
|
|
|
23 |
Y |
.027 |
.019 |
P |
|
|
|
25 |
Y |
.028 |
.024 |
P |
|
|
|
27 |
Y |
.025 |
.020 |
P |
|
|
|
29 |
Y |
.029 |
.026 |
P |
|
|
|
31 |
Y |
.025 |
.019 |
P |
|
|
|
33 |
Y |
.025 |
.019 |
P |
|
|
|
35 |
Y |
.034 |
.032 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB |
1 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
150W LED HIBAY |
Y |
35W LED PANEL |
Y |
35W LED BATTEN |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
RCD |
DB3 |
1 |
Failed trip test |
Y |
N |
N |
DB3 CB0 then changed to CB11 and tested fine |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 13/04/2021 |
---|
| |
---|
| |