Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 21/10/2020 |
---|
Technician's Name | Adam Hoes |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 51799 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | joondalup_warehouse |
---|
|
|
---|
Location Name | Joondalup Warehouse |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 01 |
3 |
Y |
027 |
018 |
P |
|
|
|
5 |
Y |
028 |
018 |
P |
|
|
|
7 |
Y |
028 |
018 |
P |
|
|
|
9 |
Y |
028 |
018 |
P |
|
|
|
11 |
Y |
027 |
018 |
P |
|
|
|
13 |
Y |
028 |
018 |
P |
|
|
|
15 |
Y |
027 |
015 |
P |
|
|
|
17 |
Y |
024 |
019 |
P |
|
|
|
19 |
Y |
024 |
015 |
P |
|
|
|
21 |
Y |
046 |
020 |
P |
|
|
|
23 |
Y |
045 |
020 |
P |
|
|
|
37 |
Y |
028 |
018 |
P |
|
|
|
39 |
Y |
029 |
019 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
EM 01 |
R |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
|
EM 02 |
R |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
|
EM 03 |
R |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
|
EM 04 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 05 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 06 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 07 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 08 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 09 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
EX 01 |
Y |
Y |
Y |
P |
|
|
|
|
EX 02 |
Y |
Y |
Y |
P |
|
|
|
|
EX 03 |
Y |
Y |
Y |
P |
|
|
|
|
EX 04 |
Y |
Y |
Y |
P |
|
|
|
|
EX 05 |
Y |
Y |
Y |
P |
|
|
|
|
EX 06 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
DAVIS LED BATTENS |
Y |
SAL LED WEATHER PROOF SENSOR BATTEN |
Y |
EMERGENCY TWIN SPOT |
Y |
EXITS |
Y |
EMERGENCY SPIT FIRE |
Y |
SURFACE LOWBAY |
Y |
DAVIS LED HIBAY |
Y |
LED DOWN LIGHT |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
FORK LIFT/PICKER CHARGERS |
NEXT TO SWITCH BOARD |
X3 |
NEW INSTALL AS STORE HAS TOO KEEP SWAPPING |
N |
Y |
TBA |
MANAGEMENT REQUEST |
SPIT FIRE EM |
EM #1, #2 & #3 |
X3 |
FAILED TEST |
Y |
N |
N |
OH&S |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 21/04/2021 |
---|
| |
---|
| |