Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 22/10/2020 |
---|
Technician's Name | Adam Hoes |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 51800 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | busselton |
---|
|
|
---|
Location Name | Busselton |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB A |
1 |
Y |
027 |
022 |
P |
|
|
|
3 |
Y |
023 |
014 |
P |
|
|
|
5 |
Y |
024 |
018 |
P |
|
|
|
7 |
Y |
023 |
035 |
P |
|
|
|
9 |
Y |
031 |
019 |
P |
|
|
|
11 |
Y |
030 |
020 |
P |
|
|
|
13 |
Y |
027 |
016 |
P |
|
|
|
15 |
Y |
024 |
016 |
P |
|
|
|
17 |
Y |
049 |
020 |
P |
|
|
|
19 |
Y |
025 |
015 |
P |
|
|
|
21 |
Y |
044 |
015 |
P |
|
|
|
35 |
Y |
048 |
018 |
P |
|
|
|
8 |
Y |
027 |
031 |
P |
|
|
|
10 |
Y |
027 |
037 |
P |
|
|
|
12 |
Y |
027 |
029 |
P |
|
|
|
16 |
Y |
026 |
016 |
P |
|
|
|
18 |
Y |
023 |
015 |
P |
|
|
|
20 |
Y |
026 |
016 |
P |
|
|
|
22 |
Y |
027 |
016 |
P |
|
|
DB B |
4 |
Y |
074 |
076 |
P |
|
|
|
6 |
Y |
039 |
038 |
P |
|
|
|
8 |
Y |
055 |
036 |
P |
|
|
|
10 |
Y |
044 |
044 |
P |
|
|
|
12 |
Y |
052 |
052 |
P |
|
|
|
32 |
Y |
054 |
051 |
P |
|
|
|
34 |
Y |
056 |
055 |
P |
|
|
|
36 |
Y |
028 |
038 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 02 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
3 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
4 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
5 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
6 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
7 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
8 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
9 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
10 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
12 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
17 |
R |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
DB 02 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 02 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
11 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
13 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
16 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
19 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
2 by 26w Troffer |
Y |
2 by 36w WP Batten |
Y |
400w Low Bay |
Y |
LED Oyster Light |
Y |
Exit |
Y |
Emergency Spitfire |
Y |
250w MH Hibay |
Y |
1 by 36w Bare Batten |
Y |
1 by 18w Bare Batten |
Y |
1by 30w Bare Batten |
Y |
50w Downlights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
PELMET LIGHTS |
MOBILE PLANS |
X1 DISPLAY BOX |
LINKABLE BATTENS - NOT ILLUMINATED - REQUIRE X8 |
N |
N |
Y |
11/11/20 - HEAD OFFICE HAVE ADVISED TO REPLACE NEXT TIME TECHNICIAN IS AT THE STORE OR UPON NEXT EPM AUDIT |
OYSTER LIGHT |
OUTSIDE LIGHT |
x2 |
FAULTY FITTING |
N |
Y |
TBA |
|
FLOOD LIGHTS |
OUTSIDE |
X4 |
FAULTY FITTING |
N |
Y |
TBA |
|
EMERGENCY SPIT FIRE |
EM 17 |
X1 |
FAILED TEST |
Y |
N |
N |
OH&S |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 22/04/2021 |
---|
| |
---|
| |