Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 22/10/2020 |
---|
Technician's Name | Adam Hoes |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 51801 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | busselton_storage + warehouse |
---|
|
|
---|
Location Name | Busselton Storage & Warehouse |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 01 - Storage |
7 |
Y |
032 |
042 |
P |
|
|
DB 01 - Storage |
2 |
Y |
039 |
039 |
P |
|
|
DB 01 - OFFSITE |
1 |
Y |
048 |
018 |
P |
|
|
DB 01 - OFFSITE |
3 |
Y |
028 |
018 |
P |
|
|
DB 01 - OFFSITE |
5 |
Y |
031 |
021 |
P |
|
|
DB 01 - OFFSITE |
4 |
Y |
028 |
018 |
P |
|
|
DB 01 - OFFSITE |
6 |
Y |
026 |
018 |
P |
|
|
DB 01 - OFFSITE |
8 |
Y |
028 |
018 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 -STOREAGE |
EM 02 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 02 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 03 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 04 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 05 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 06 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 07 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 08 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 09 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 10 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 - STORAGE |
EM 01 |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 01 |
Y |
Y |
Y |
P |
|
|
|
DB 01 - OFFSITE |
EM 011 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
EXIT |
Y |
JUMBO EXIT |
Y |
LED HIBAY |
Y |
SURFACE MOUNT EM |
Y |
SPIT FIRE EM |
Y |
LED DOWN LIGHT |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
OYSTER LIGHT |
OUTSIDE AWNING |
X2 |
FAULTY |
N |
Y |
TBA |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 22/04/2020 |
---|
| |
---|
| |