Partner NameBuilt Electrical Australia
StateVIC
Date of Visit27/10/2020
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number51747
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICbayswater

Location NameBAYSWATER
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB01 SEC01 01 Y 28 38 P
DB01 SEC01 02 Y 38 37 P
DB01 SEC01 03 Y 37 37 P
DB01 SEC01 04 Y 20 80 P
DB01 SEC01 05 Y 28 38 P
DB01 SEC01 06 Y 29 38 P
DB01 SEC01 07 Y 28 38 P
DB01 SEC01 08 Y 37 37 P
DB01 SEC01 09 Y OL 38 F FAILED TEST Y
DB01 SEC01 10 Y 37 37 P
DB01 SEC01 11 Y 28 38 P
DB01 SEC01 12 Y 37 37 P
DB01 SEC01 13 Y 37 36 P
DB01 SEC01 14 Y 28 20 P
DB01 SEC01 15 Y 29 61 P
DB01 SEC01 16 Y 28 38 P
DB01 SEC01 17 Y 33 32 P
DB01 SEC01 18 Y 28 38 P
DB01 SEC01 19 Y 37 37 P
DB01 SEC01 20 Y 28 20 P
DB01 SEC01 21 Y 37 37 P
DB01 SEC01 22 Y 28 38 P
DB01 SEC01 23 Y 28 22 P
DB01 SEC01 24 Y 30 22 P
DB01 SEC01 25 Y 28 38 P
DB01 SEC01 26 Y 28 38 P
DB01 SEC01 27 Y 37 37 P
DB01 SEC01 28 Y 39 42 P
DB01 SEC01 29 Y 30 28 P
DB01 SEC01 30 Y 28 38 P
DB01 SEC01 31 Y 28 20 P
DB01 SEC01 33 Y 28 38 P
DB01 SEC01 35 Y 43 43 P
DB01 SEC02 01 Y 28 38 P
DB01 SEC02 02 Y 28 38 P
DB01 SEC02 03 Y 28 38 P
DB01 SEC02 04 Y 28 38 P
DB01 SEC02 05 Y 28 38 P
DB01 SEC02 06 Y 28 38 P
DB01 SEC02 07 Y 28 21 P
DB01 SEC02 08 Y 28 38 P
DB01 SEC02 09 Y 28 19 P
DB01 SEC02 10 Y 28 38 P
DB01 SEC02 11 Y 28 20 P
DB01 SEC02 12 Y 28 38 P
DB01 SEC02 13 Y 31 20 P
DB01 SEC02 14 Y 28 38 P
DB01 SEC02 15 Y 30 40 P
DB01 SEC02 16 Y 30 40 P
DB01 SEC02 17 Y 28 38 P
DB01 SEC02 18 Y 23 19 P
DB01 SEC02 19 Y 31 41 P
DB01 SEC02 20 Y 30 35 P
DB01 SEC02 21 Y 30 40 P
DB01 SEC02 22 Y 30 40 P
DB01 SEC02 23 Y 29 20 P
DB01 SEC02 24 Y 30 21 P
MSB SEC01 13 Y 133 41 P
MSB SEC01 20 Y 29 38 P
MSB SEC01 21 Y 24 41 P
MSB SEC01 23 Y 28 20 P
MSB SEC01 33 Y 30 40 P
MSB SEC02 08 Y 30 40 P
MSB SEC02 10 Y 26 40 P
MSB SEC02 12 Y 30 25 P
MSB SEC02 13 Y 28 22 P
MSB SEC02 14 Y 29 23 P
MSB SEC02 15 Y 28 21 P
MSB SEC02 16 Y 26 46 P
MSB SEC02 17 Y 28 38 P
MSB SEC02 18 Y 31 22 P
MSB SEC02 19 Y 28 21 P
MSB SEC02 20 Y 30 19 P
MSB SEC02 21 Y 84 37 P
MSB SEC02 22 Y 31 40 P
MSB SEC02 23 Y 28 38 P
MSB SEC02 24 Y 30 24 P
MSB SEC02 25 Y 24 25 P
MSB SEC02 26 Y 31 26 P
MSB SEC02 27 Y 9 18 P REPLACE FOR 20A DUE TO WRONG ORIENTATION OF SWITCHING
MSB SEC02 28 Y 27 23 P
MSB SEC02 29 Y 28 20 P
MSB SEC02 30 Y 28 21 P
MSB SEC02 31 Y 83 37 P
MSB SEC02 32 Y 27 37 P
MSB SEC02 33 Y 37 37 P
MSB SEC02 34 Y 31 41 P
MSB SEC02 35 Y 28 38 P
MSB SEC02 36 Y 30 35 P
MSB SEC02 37 Y 36 43 P
DB02 01 Y 28 38 P
DB02 02 NA NA LOCKED OUT
DB02 03 Y 28 18 P
DB02 04 Y 112 40 P
DB02 05 Y 28 18 P
DB02 06 Y 28 19 P
DB02 07 Y 30 40 P
DB02 08 Y 28 34 P
DB02 09 Y 28 18 P
DB02 10 Y 33 42 P
DB02 11 Y 28 18 P
DB02 12 Y 28 39 P
DB02 17 Y 28 18 P
DB02 18 Y 28 18 P
DB02 20 Y 28 18 P
DB02 22 Y 28 18 P
DB02 24 Y 28 18 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 S Y F Y F FAILED BATTERY TEST Y N
DB1 2 S Y Y Y P
DB1 3 S Y Y Y P
DB1 4 S Y Y Y P
DB1 5 S Y Y Y P
DB1 6 S Y Y Y P
DB1 7 S Y F Y F FAILED BATTERY TEST Y N
DB1 8 S Y Y Y P
DB1 9 S Y Y Y P
DB1 10 S Y Y Y P
DB1 11 S Y Y Y P
DB1 12 R Y F Y F FAILED BATTERY TEST Y N
DB1 13 R Y F Y F FAILED BATTERY TEST Y N
DB1 14 R Y Y Y P
DB1 15 R Y Y Y P
DB1 16 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 Y Y Y P
DB1 2 N Y Y F FAILED TO ILLUMINATE Y N
DB1 3 Y Y Y P
DB1 4 Y Y Y P
DB1 5 Y Y Y P
DB1 6 Y Y Y P
DB1 7 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
INDUCTION HIBAY LIGHTS Y
LED HIBAY LIGHTS Y
EMERGENCY SINGLE 36W BATTEN Y
EMERGENCY RECESSED LIGHTS Y
BARDIC EXIT LIGHTS Y
70MM DOWNLIGHTS Y
36W SINGLE FLUORESCENT BARE BATTEN Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
BLACK LED HIGHBAY INBETWEEN HAIER DISPLAY AND LAPTOP TABLE 1 FLASHING ON AND OFF DAVIS N RETURN VISIT REQUIRED AFTER PARTS ARE PROCURED - SCISSOR REQUIRED
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
EM01 KITCHENS 1 FAILED BATTERY TEST Y N N REPLACE FOR DUEL LED SURFACE MOUNT - SCISSOR REQUIRED
EM07 FRIDGES 1 FAILED BATTERY TEST Y N N REPLACE FOR DUEL LED SURFACE MOUNT - SCISSOR REQUIRED
EM12 WALL BRACKETS 1 FAILED BATTERY TEST Y N N REPLACE FOR DUEL LED SURFACE MOUNT - SCISSOR REQUIRED
EM13 BOH AISLE 1 FAILED BATTERY TEST Y N N REPLACE FOR DUEL LED SURFACE MOUNT - SCISSOR REQUIRED
EX02 SANDWICH PRESS 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW - SCISSOR REQUIRED
CB27 MSB SEC02 1 WRONG ORIENTATION OF SWITCHING Y N N RETURN VISIT REQUIRED BEFORE TRADE, REPLACE WITH SCHNEIDER 20A RCBO IC60N
CB09 DB01 SEC01 1 FAILED TEST Y N N RETURN VISIT REQUIRED BEFORE TRADE, REPLACE WITH SCHNEIDER 20A RCBO IC60N
CB05 DB01 SEC02 1 TRIPPING Y N N INVESTIGATED, FOUND TOO MANY WASHING MACHINES PLUGED IN, UNPLUGED VARIOUS WASHING MACHINES, FOUND FAULTY POWERBOARD AND REMOVED, PLUGED IN DISPLAY LIGHTING ON MIELE, BOSCH, FISHER AND PAYKEL AND SAMSUNG. CIRCUIT NO LONGER TRIPPING.
SINGLE 28W/840 BARE BATTEN STAFF TOILET HALLWAY 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW LAMP
SINGLE 28W/840 BARE BATTEN STAFF LUNCHROOM 2 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW LAMP
SINGLE 28W/840 BARE BATTEN TRAINING ROOM 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW LAMP
LED RACK LIGHTING SEASONAL 3 FAILED TO ILLUMINATE Y N N FOUND UNPLUGGED. RE-PLUGGED BACK IN.
LED RACK SIGN FABRIC FRIDGES 1 FAILED TO ILLUMINATE Y N N AFTER INVESTIGATING FOUND LOOSE CONNECTION ON ELV SIDE OF POWER SUPPLY
LED RACK SIGN FABRIC ACS 1 FAILED TO ILLUMINATE Y N N FOUND UNPLUGGED. RE-PLUGGED BACK IN.
LED RACK SIGN FABRIC SONOS 1 FAILED TO ILLUMINATE Y N N FOUND UNPLUGGED. RE-PLUGGED BACK IN.
SAT COUNTER NEAR ASKO DISPLAY KITCHEN AREA 1 CURRENTLY BEING SWITCHED BY BMS UNIT AND NOT POWERING UP TILL JUST BEFORE 9. Y N N INVESTIGATED CIRCUIT, REMOVED FROM CONTACTOR NOW SUPPLIES 24 HOURS POWER
Site Status SelectorStore now fully compliant
Next Test Due in 6 months27/04/2021