Carry out push button test and record the results below.
RCD Details (Biennial)
Distribution Board No.
Circuit No.
Push Button (YorN)
0 Degrees
180 Degrees
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB01 SEC01
01
Y
28
38
P
DB01 SEC01
02
Y
38
37
P
DB01 SEC01
03
Y
37
37
P
DB01 SEC01
04
Y
20
80
P
DB01 SEC01
05
Y
28
38
P
DB01 SEC01
06
Y
29
38
P
DB01 SEC01
07
Y
28
38
P
DB01 SEC01
08
Y
37
37
P
DB01 SEC01
09
Y
OL
38
F
FAILED TEST
Y
DB01 SEC01
10
Y
37
37
P
DB01 SEC01
11
Y
28
38
P
DB01 SEC01
12
Y
37
37
P
DB01 SEC01
13
Y
37
36
P
DB01 SEC01
14
Y
28
20
P
DB01 SEC01
15
Y
29
61
P
DB01 SEC01
16
Y
28
38
P
DB01 SEC01
17
Y
33
32
P
DB01 SEC01
18
Y
28
38
P
DB01 SEC01
19
Y
37
37
P
DB01 SEC01
20
Y
28
20
P
DB01 SEC01
21
Y
37
37
P
DB01 SEC01
22
Y
28
38
P
DB01 SEC01
23
Y
28
22
P
DB01 SEC01
24
Y
30
22
P
DB01 SEC01
25
Y
28
38
P
DB01 SEC01
26
Y
28
38
P
DB01 SEC01
27
Y
37
37
P
DB01 SEC01
28
Y
39
42
P
DB01 SEC01
29
Y
30
28
P
DB01 SEC01
30
Y
28
38
P
DB01 SEC01
31
Y
28
20
P
DB01 SEC01
33
Y
28
38
P
DB01 SEC01
35
Y
43
43
P
DB01 SEC02
01
Y
28
38
P
DB01 SEC02
02
Y
28
38
P
DB01 SEC02
03
Y
28
38
P
DB01 SEC02
04
Y
28
38
P
DB01 SEC02
05
Y
28
38
P
DB01 SEC02
06
Y
28
38
P
DB01 SEC02
07
Y
28
21
P
DB01 SEC02
08
Y
28
38
P
DB01 SEC02
09
Y
28
19
P
DB01 SEC02
10
Y
28
38
P
DB01 SEC02
11
Y
28
20
P
DB01 SEC02
12
Y
28
38
P
DB01 SEC02
13
Y
31
20
P
DB01 SEC02
14
Y
28
38
P
DB01 SEC02
15
Y
30
40
P
DB01 SEC02
16
Y
30
40
P
DB01 SEC02
17
Y
28
38
P
DB01 SEC02
18
Y
23
19
P
DB01 SEC02
19
Y
31
41
P
DB01 SEC02
20
Y
30
35
P
DB01 SEC02
21
Y
30
40
P
DB01 SEC02
22
Y
30
40
P
DB01 SEC02
23
Y
29
20
P
DB01 SEC02
24
Y
30
21
P
MSB SEC01
13
Y
133
41
P
MSB SEC01
20
Y
29
38
P
MSB SEC01
21
Y
24
41
P
MSB SEC01
23
Y
28
20
P
MSB SEC01
33
Y
30
40
P
MSB SEC02
08
Y
30
40
P
MSB SEC02
10
Y
26
40
P
MSB SEC02
12
Y
30
25
P
MSB SEC02
13
Y
28
22
P
MSB SEC02
14
Y
29
23
P
MSB SEC02
15
Y
28
21
P
MSB SEC02
16
Y
26
46
P
MSB SEC02
17
Y
28
38
P
MSB SEC02
18
Y
31
22
P
MSB SEC02
19
Y
28
21
P
MSB SEC02
20
Y
30
19
P
MSB SEC02
21
Y
84
37
P
MSB SEC02
22
Y
31
40
P
MSB SEC02
23
Y
28
38
P
MSB SEC02
24
Y
30
24
P
MSB SEC02
25
Y
24
25
P
MSB SEC02
26
Y
31
26
P
MSB SEC02
27
Y
9
18
P
REPLACE FOR 20A DUE TO WRONG ORIENTATION OF SWITCHING
MSB SEC02
28
Y
27
23
P
MSB SEC02
29
Y
28
20
P
MSB SEC02
30
Y
28
21
P
MSB SEC02
31
Y
83
37
P
MSB SEC02
32
Y
27
37
P
MSB SEC02
33
Y
37
37
P
MSB SEC02
34
Y
31
41
P
MSB SEC02
35
Y
28
38
P
MSB SEC02
36
Y
30
35
P
MSB SEC02
37
Y
36
43
P
DB02
01
Y
28
38
P
DB02
02
NA
NA
LOCKED OUT
DB02
03
Y
28
18
P
DB02
04
Y
112
40
P
DB02
05
Y
28
18
P
DB02
06
Y
28
19
P
DB02
07
Y
30
40
P
DB02
08
Y
28
34
P
DB02
09
Y
28
18
P
DB02
10
Y
33
42
P
DB02
11
Y
28
18
P
DB02
12
Y
28
39
P
DB02
17
Y
28
18
P
DB02
18
Y
28
18
P
DB02
20
Y
28
18
P
DB02
22
Y
28
18
P
DB02
24
Y
28
18
P
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB1
1
S
Y
F
Y
F
FAILED BATTERY TEST
Y
N
DB1
2
S
Y
Y
Y
P
DB1
3
S
Y
Y
Y
P
DB1
4
S
Y
Y
Y
P
DB1
5
S
Y
Y
Y
P
DB1
6
S
Y
Y
Y
P
DB1
7
S
Y
F
Y
F
FAILED BATTERY TEST
Y
N
DB1
8
S
Y
Y
Y
P
DB1
9
S
Y
Y
Y
P
DB1
10
S
Y
Y
Y
P
DB1
11
S
Y
Y
Y
P
DB1
12
R
Y
F
Y
F
FAILED BATTERY TEST
Y
N
DB1
13
R
Y
F
Y
F
FAILED BATTERY TEST
Y
N
DB1
14
R
Y
Y
Y
P
DB1
15
R
Y
Y
Y
P
DB1
16
R
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB1
1
Y
Y
Y
P
DB1
2
N
Y
Y
F
FAILED TO ILLUMINATE
Y
N
DB1
3
Y
Y
Y
P
DB1
4
Y
Y
Y
P
DB1
5
Y
Y
Y
P
DB1
6
Y
Y
Y
P
DB1
7
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
INDUCTION HIBAY LIGHTS
Y
LED HIBAY LIGHTS
Y
EMERGENCY SINGLE 36W BATTEN
Y
EMERGENCY RECESSED LIGHTS
Y
BARDIC EXIT LIGHTS
Y
70MM DOWNLIGHTS
Y
36W SINGLE FLUORESCENT BARE BATTEN
Y
Are there any Warranty items needing to be repaired?
Yes
WARRANTY
Defect Item
Location of Item (on premises)
Quantity
Details of fault/problem
Manufacturer
Part Number
Repaired on Site
Comments
BLACK LED HIGHBAY
INBETWEEN HAIER DISPLAY AND LAPTOP TABLE
1
FLASHING ON AND OFF
DAVIS
N
RETURN VISIT REQUIRED AFTER PARTS ARE PROCURED - SCISSOR REQUIRED
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
EM01
KITCHENS
1
FAILED BATTERY TEST
Y
N
N
REPLACE FOR DUEL LED SURFACE MOUNT - SCISSOR REQUIRED
EM07
FRIDGES
1
FAILED BATTERY TEST
Y
N
N
REPLACE FOR DUEL LED SURFACE MOUNT - SCISSOR REQUIRED
EM12
WALL BRACKETS
1
FAILED BATTERY TEST
Y
N
N
REPLACE FOR DUEL LED SURFACE MOUNT - SCISSOR REQUIRED
EM13
BOH AISLE
1
FAILED BATTERY TEST
Y
N
N
REPLACE FOR DUEL LED SURFACE MOUNT - SCISSOR REQUIRED
EX02
SANDWICH PRESS
1
FAILED TO ILLUMINATE
Y
N
N
REPLACED WITH NEW - SCISSOR REQUIRED
CB27
MSB SEC02
1
WRONG ORIENTATION OF SWITCHING
Y
N
N
RETURN VISIT REQUIRED BEFORE TRADE, REPLACE WITH SCHNEIDER 20A RCBO IC60N
CB09
DB01 SEC01
1
FAILED TEST
Y
N
N
RETURN VISIT REQUIRED BEFORE TRADE, REPLACE WITH SCHNEIDER 20A RCBO IC60N
CB05
DB01 SEC02
1
TRIPPING
Y
N
N
INVESTIGATED, FOUND TOO MANY WASHING MACHINES PLUGED IN, UNPLUGED VARIOUS WASHING MACHINES, FOUND FAULTY POWERBOARD AND REMOVED, PLUGED IN DISPLAY LIGHTING ON MIELE, BOSCH, FISHER AND PAYKEL AND SAMSUNG. CIRCUIT NO LONGER TRIPPING.
SINGLE 28W/840 BARE BATTEN
STAFF TOILET HALLWAY
1
FAILED TO ILLUMINATE
Y
N
N
REPLACED WITH NEW LAMP
SINGLE 28W/840 BARE BATTEN
STAFF LUNCHROOM
2
FAILED TO ILLUMINATE
Y
N
N
REPLACED WITH NEW LAMP
SINGLE 28W/840 BARE BATTEN
TRAINING ROOM
1
FAILED TO ILLUMINATE
Y
N
N
REPLACED WITH NEW LAMP
LED RACK LIGHTING
SEASONAL
3
FAILED TO ILLUMINATE
Y
N
N
FOUND UNPLUGGED. RE-PLUGGED BACK IN.
LED RACK SIGN FABRIC
FRIDGES
1
FAILED TO ILLUMINATE
Y
N
N
AFTER INVESTIGATING FOUND LOOSE CONNECTION ON ELV SIDE OF POWER SUPPLY
LED RACK SIGN FABRIC
ACS
1
FAILED TO ILLUMINATE
Y
N
N
FOUND UNPLUGGED. RE-PLUGGED BACK IN.
LED RACK SIGN FABRIC
SONOS
1
FAILED TO ILLUMINATE
Y
N
N
FOUND UNPLUGGED. RE-PLUGGED BACK IN.
SAT COUNTER
NEAR ASKO DISPLAY KITCHEN AREA
1
CURRENTLY BEING SWITCHED BY BMS UNIT AND NOT POWERING UP TILL JUST BEFORE 9.
Y
N
N
INVESTIGATED CIRCUIT, REMOVED FROM CONTACTOR NOW SUPPLIES 24 HOURS POWER
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
27/04/2021