Partner Name | Built Services |
---|
State | WA |
---|
Date of Visit | 13/10/2020 |
---|
Technician's Name | Dan |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 51796 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | malaga |
---|
|
|
---|
Location Name | Malaga |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
W3 |
Y |
28 |
19 |
P |
|
|
|
B3 |
Y |
19 |
27 |
P |
|
|
|
W9 |
Y |
28 |
45 |
P |
|
|
|
11R |
Y |
28 |
10 |
P |
|
|
|
11W |
Y |
45 |
- |
F |
Not tripping at 180 degrees |
Y |
|
11B |
Y |
- |
- |
F |
Not tripping at 0 or 180 degrees |
Y |
|
13R |
Y |
27 |
27 |
P |
|
|
|
13W |
Y |
33 |
11 |
P |
|
|
|
15R |
Y |
28 |
28 |
P |
|
|
|
15W |
Y |
484 |
48 |
P |
|
|
|
23R |
Y |
29.9 |
29 |
P |
|
|
|
23W |
Y |
29 |
29 |
P |
|
|
|
27R |
Y |
27 |
27 |
P |
|
|
|
31R |
Y |
110 |
110 |
P |
|
|
|
31B |
Y |
28 |
18 |
P |
|
|
|
33R |
Y |
28 |
19 |
P |
|
|
|
33W |
Y |
28 |
20 |
P |
|
|
|
33B |
Y |
38 |
28 |
P |
|
|
|
10R |
Y |
66 |
25 |
P |
|
|
|
10W |
Y |
18 |
23 |
P |
|
|
|
10B |
Y |
37 |
37 |
P |
|
|
|
12R |
Y |
28 |
28 |
P |
|
|
|
12W |
Y |
27 |
28 |
P |
|
|
|
12B |
Y |
30 |
29 |
P |
|
|
|
32R |
Y |
28 |
19 |
P |
|
|
|
32B |
Y |
28 |
19 |
P |
|
|
|
34R |
Y |
28 |
19 |
P |
|
|
|
34W |
Y |
28 |
19 |
P |
|
|
|
W32 |
Y |
27 |
16 |
P |
|
|
|
R7 |
Y |
28 |
19 |
P |
|
|
|
R9 |
Y |
22 |
16 |
P |
|
|
|
B6 |
Y |
18 |
28 |
P |
|
|
|
B8 |
Y |
28 |
18 |
P |
|
|
|
R19 |
Y |
28 |
19 |
P |
|
|
|
W19 |
Y |
28 |
19 |
P |
|
|
|
R27 |
Y |
32 |
32 |
P |
|
|
|
W20 |
Y |
30 |
30 |
P |
|
|
|
B20 |
Y |
30 |
30 |
P |
|
|
|
W24 |
Y |
44 |
44 |
P |
|
|
|
B24 |
Y |
18 |
18 |
P |
|
|
|
R28 |
Y |
100 |
96 |
P |
|
|
|
W28 |
Y |
26 |
26 |
P |
|
|
|
B28 |
Y |
42 |
42 |
P |
|
|
|
R30 |
Y |
29 |
29 |
P |
|
|
|
B30 |
Y |
23 |
19 |
P |
|
|
DB2 |
5R |
Y |
29 |
29 |
P |
|
|
|
5W |
Y |
36 |
36 |
P |
|
|
|
5B |
Y |
35 |
7 |
P |
|
|
|
7R |
Y |
28 |
31 |
P |
|
|
|
7W |
Y |
36 |
35 |
P |
|
|
|
7B |
Y |
26 |
29 |
P |
|
|
|
9R |
Y |
29 |
52 |
P |
|
|
|
9W |
Y |
28 |
45 |
P |
|
|
|
9B |
Y |
43 |
43 |
P |
|
|
|
6R |
Y |
28 |
28 |
P |
|
|
|
6W |
Y |
28 |
33 |
P |
|
|
|
6B |
Y |
44 |
35 |
P |
|
|
|
8R |
Y |
28 |
28 |
P |
|
|
|
8W |
Y |
36 |
30 |
P |
|
|
|
8B |
Y |
30 |
29 |
P |
|
|
|
10R |
Y |
31 |
31 |
P |
|
|
|
18W |
Y |
28 |
19 |
P |
|
|
|
1R |
Y |
30 |
29 |
P |
|
|
|
1B |
Y |
65 |
52 |
P |
|
|
|
3R |
Y |
30 |
30 |
P |
|
|
|
2R |
Y |
29 |
29 |
P |
|
|
|
2W |
Y |
29 |
29 |
P |
|
|
|
W3 |
Y |
27 |
28 |
P |
|
|
|
B3 |
Y |
28 |
19 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
3 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
4 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
5 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
6 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
7 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
8 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
9 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
10 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
11 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
12 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
22 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
23 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
24 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
16 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
18 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
21 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
22 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
26 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
27 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
28 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
29 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
30 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
31 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
32 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
400w low bay |
Y |
400w low bay defused |
Y |
1 by 36w defused battens |
Y |
40w oyster light |
Y |
50w 12v down lights |
Y |
150w mh shop lights |
Y |
400w hibay |
Y |
Exit |
Y |
Emergency spit fire em |
Y |
Emergency 2 by 36w |
Y |
40w b27 batten globe |
Y |
LED spot lights |
Y |
60w bunker lights |
Y |
Par 38 twin spots |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
DB 01 - 11W & 11B |
SWITCHBOARD |
2 |
FAULTY |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|