StateVIC
Date of Visit30/10/2020
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number51749
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICbrighton

Location NameBrighton
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
CHASSIS A 14 Y 41 39 P
CHASSIS A 16 Y 38 38 P
CHASSIS A 18 Y 38 38 P
CHASSIS A 19 Y 31 38 P
CHASSIS A 20 Y 32 31 P
CHASSIS A 21 Y 40 32 P
CHASSIS A 22 Y 39 38 P
CHASSIS A 23 Y 35 31 P
CHASSIS A 24 Y 39 32 P
CHASSIS A 25 Y 43 39 P
CHASSIS A 26 Y 34 32 P
CHASSIS A 27 Y 36 33 P
CHASSIS A 28 Y 41 46 P
CHASSIS A 29 Y 39 39 P
CHASSIS A 30 Y 31 47 P
CHASSIS A 31 Y 42 41 P
CHASSIS A 32 Y 41 70 P
CHASSIS A 33 Y 37 37 P
CHASSIS A 34 Y 38 32 P
CHASSIS A 35 Y 39 35 P
CHASSIS A 36 Y 30 30 P
CHASSIS A 37 Y 39 40 P
CHASSIS A 38 Y 38 34 P
CHASSIS A 39 Y 38 38 P
CHASSIS A 40 Y 60 55 P
CHASSIS A 41 Y 34 32 P
CHASSIS A 42 Y 36 36 P
CHASSIS A 43 Y 38 33 P
CHASSIS A 44 Y 90 - F Failed trip test N
CHASSIS A 45 Y 37 33 P
CHASSIS A 46 Y 35 50 P
CHASSIS A 47 Y 46 43 P
CHASSIS A 48 Y 34 31 P
CHASSIS A 49 Y 31 38 P
CHASSIS A 50 Y 36 37 P
CHASSIS A 51 Y 38 38 P
CHASSIS A 52 Y 32 38 P
CHASSIS A 53 Y 36 38 P
CHASSIS A 54 Y 43 37 P
CHASSIS A 55 Y 40 38 P
CHASSIS A 57 Y 41 40 P
CHASSIS A 59 y 43 34 P
CHASSIS B 01 Y 42 39 P
CHASSIS B 02 Y 38 38 P
CHASSIS B 03 Y 37 31 P
CHASSIS B 04 Y 40 35 P
CHASSIS B 05 Y 39 37 P
CHASSIS B 06 Y 31 30 P
CHASSIS B 07 Y 38 38 P
CHASSIS B 08 Y 38 39 P
CHASSIS B 09 Y 30 29 P
CHASSIS B 10 Y 38 38 P
CHASSIS B 11 Y 38 39 P
CHASSIS B 12 Y 38 31 P
CHASSIS B 13 Y 38 33 P
CHASSIS B 14 Y 38 32 P
CHASSIS B 15 Y 31 30 P
CHASSIS B 16 y 41 34 p
CHASSIS B 17 Y 38 38 P
CHASSIS B 18 Y 31 29 P
CHASSIS B 19 Y 38 38 P
CHASSIS B 20 Y 31 32 P
CHASSIS B 21 Y 32 31 P
CHASSIS B 22 Y 31 38 P
CHASSIS B 23 Y 39 32 P
CHASSIS B 24 Y 39 38 P
CHASSIS B 25 Y 30 31 P
CHASSIS B 26 Y 39 42 P
CHASSIS B 27 Y 38 31 P
CHASSIS B 28 Y 33 31 P
CHASSIS B 29 Y 38 32 P
CHASSIS B 30 Y 30 37 P
CHASSIS B 31 Y 38 31 P
CHASSIS B 32 Y 43 33 P
CHASSIS B 33 Y 41 40 P
CHASSIS B 34 Y 36 35 P
CHASSIS B 35 Y 30 38 P
CHASSIS B 36 Y 37 31 P
CHASSIS B 37 Y 39 33 P
CHASSIS B 38 Y 37 37 P
CHASSIS B 39 Y 38 32 P
CHASSIS B 40 Y 39 35 P
CHASSIS B 41 Y 38 32 P
CHASSIS B 42 Y 37 36 P
CHASSIS B 43 Y 38 38 P
CHASSIS B 44 Y 54 43 P
CHASSIS B 45 Y 33 31 P
CHASSIS B 46 Y 32 31 P
CHASSIS B 47 Y 38 30 P
CHASSIS B 48 Y 40 39 P
CHASSIS B 49 Y 32 37 P
CHASSIS B 50 Y 32 31 P
CHASSIS B 51 Y 38 31 P
CHASSIS B 52 Y 38 37 P
CHASSIS B 53 Y 39 39 P
CHASSIS B 55 Y 38 38 P
CHASSIS B 57 Y 32 30 P
CHASSIS B 59 Y 30 29 P
SUB BOARD 2 01 Y 8 18 P
SUB BOARD 2 02 Y 8 18 P
SUB BOARD 2 03 Y 8 18 P
SUB BOARD 2 04 Y 8 18 P
SUB BOARD 2 05 y 12 18 P
SUB BOARD 2 06 Y 10 20 P
SUB BOARD 2 07 Y 10 19 P
SUB BOARD 2 08 Y 8 18 P
SUB BOARD 2 13 Y 8 18 P
SUB BOARD 2 14 Y 13 13 P
SUB BOARD 2 15 Y 37 17 P
SUB BOARD 2 16 Y 8 18 P
SUB BOARD 2 17 Y 8 18 P
SUB BOARD 2 18 Y 12 19 P
SUB BOARD 2 19 Y 12 17 P
SUB BOARD 2 25 Y 28 19 P
SUB BOARD 2 26 Y 9 18 P
SUB BOARD 2 27 6 8 18 P
SUB BOARD 2 28 Y 11 20 P
SUB BOARD 2 29 Y 8 18 P
SUB BOARD 2 30 Y 11 18 P
SUB BOARD 2 31 Y 8 18 P
SUB BOARD 2 32 Y 10 19 P
SUB BOARD 3A 01 Y 37 33 P
SUB BOARD 3A 02 y 27 32 P
SUB BOARD 3A 03 Y 27 18 P
SUB BOARD 3A 04 Y 31 34 P
SUB BOARD 3A 05 Y 30 20 P
SUB BOARD 3A 06 Y 31 21 P
SUB BOARD 3A 08 Y 28 32 P
SUB BOARD 3A 11 Y 77 32 P
SUB BOARD 3A 12 Y 77 33 P
SUB BOARD 3A 13 Y 27 32 P
SUB BOARD 3A 14 Y 28 32 P
SUB BOARD 3A 15 Y 27 32 P
SUB BOARD 3A 16 Y 29 32 P
SUB BOARD 3A 17 Y 28 32 P
SUB BOARD 3A 18 Y 46 33 P
SUB BOARD 3A 19 Y 28 32 P
SUB BOARD 3A 20 Y 41 33 P
SUB BOARD 3A 21 Y 27 32 P
SUB BOARD 4 02 Y 19 18 P
SUB BOARD 4 46 Y 19 19 P
SUB BOARD 4A 01 Y 15 6 P
SUB BOARD 4A 02 Y 28 18 P
SUB BOARD 4A 03 Y - - NA Tripping N
SUB BOARD 4A 04 Y 27 18 P
SUB BOARD 4A 05 Y 37 26 P
SUB BOARD 4A 06 Y 40 27 P
SUB BOARD 4A 07 Y 28 18 P
SUB BOARD 4A 08 Y 27 17 P
SUB BOARD 4A 09 Y 28 18 P
SUB BOARD 4A 10 Y 27 17 P
SUB BOARD 4A 11 Y 27 18 P
SUB BOARD 4A 12 Y 27 17 P
SUB BOARD 4A 13 Y 27 17 P
SUB BOARD 4A 14 Y 27 17 P
SUB BOARD 4A 15 Y 28 18 P
SUB BOARD 4B 01 Y 43 34 P
SUB BOARD 4B 02 Y OL OL F Failed trip test Y
SUB BOARD 4B 03 Y 30 20 P
SUB BOARD 4B 04 Y 23 18 P
SUB BOARD 4B 05 Y 25 18 P
SUB BOARD 4B 06 Y 28 18 P
SUB BOARD 4B 07 Y 29 19 P
SUB BOARD 4B 08 Y 42 32 P
SUB BOARD 4B 09 Y 38 34 P
SUB BOARD 4B 10 Y 23 18 P
SUB BOARD 4B 11 Y 34 26 P
SUB BOARD 4B 12 Y 30 19 P
SUB BOARD 4B 13 Y 26 17 P
SUB BOARD 4B 14 Y 30 21 P
SUB BOARD 4B 15 Y Ol NA F Failed trip test Y
SUB BOARD 4B 16 Y 104 25 P
SUB BOARD 4B 17 Y 28 18 P
SUB BOARD 4B 18 Y 29 18 P
SUB BOARD 4B 19 Y 30 20 P
SUB BOARD 4B 20 Y 27 17 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
Db1 1 R Y Y Y P
Db1 2 R Y Y Y P
Db1 3 R Y Y Y P
Db1 4 R Y Y Y P
Db1 5 R Y Y Y P
Db1 6 R Y Y Y P
Db1 7 R Y Y Y P
Db1 8 R Y Y Y P
Db1 9 R Y Y Y P
Db1 10 R Y Y Y P
Db1 11 R Y Y Y P
Db1 12 R Y Y Y P
Db1 13 R Y Y Y P
Db1 14 R Y Y Y P
Db1 15 R Y Y Y P
Db1 16 R Y Y Y P
Db1 17 R Y Y Y P
Db1 18 R Y Y Y P
Db1 19 R Y Y Y P
Db1 20 R Y Y Y P
Db1 21 R Y Y Y P
Db1 22 R Y Y Y P
Db1 23 R Y Y Y P
Db1 24 R Y Y Y P
Db1 25 R Y Y Y P
Db1 26 R Y Y Y P
Db1 27 R Y Y Y P
Db1 28 R Y Y Y P
Db1 29 R Y Y Y P
Db1 30 R Y Y Y P
Db1 31 R Y Y Y P
Db1 32 R Y Y Y P
Db1 33 R Y Y Y P
Db1 34 R Y Y Y P
Db1 35 R Y Y Y P
Db1 36 R Y Y Y P
Db1 37 R Y Y Y P
Db1 38 R Y Y Y P
Db1 39 R Y Y Y P
Db1 40 R Y Y Y P
Db1 41 R Y Y Y P
Db1 42 R Y Y Y P
Db1 43 R Y Y Y P
Db1 44 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
Db1 1 Y Y Y P
Db1 2 Y Y Y P
Db1 3 Y Y Y P
Db1 4 Y Y Y P
Db1 5 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Recessed Double T5 Fluorescent Light Fitting Y
Single 36W Fluorescent Light Fitting Y
Mercury Vapour Hi-Bay Light Fitting Y
70mm Downlights Y
MR16 Track Spot Lights LED Y
Halogen Recessed Spot Light Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
CB2 SUB BOARD 4B 1 Faulty FAILED RCD TEST Y N N REPLACED WITH NEW
CB15 SUB BOARD 4B 1 Faulty FAILED RCD TEST Y N N RETURN VISIT REQUIRED BEFORE TRADE. REPLACE WITH NHP MOD6 M6RCBD2030C
CB3 SUB BOARD 4A 1 RCBO TRIPPING FAULTY CIRCUIT N N N EXTERNAL LIGHTING. TO BE REPAIRED DURING QUOTED WORKS 0947
CB44 MSB CHASSIS A 1 RCBO TRIPPING, FAULTY CIRCUIT N N N EXTERNAL LIGHTING. TO BE REPAIRED DURING QUOTED WORKS 0947
BAYONET GLOBE 3K FEMALE TOILET 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW
BAYONET GLOBE 3K MALE TOILET 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW
LED PANEL LIGHT STORE ROOM 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW
LED PANEL LIGHT COOKWARE 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW
TEST AND TAG STOREROOM/COUNTERS/SAT COUNTERS/STAFF AREAS 50+ NEXT TEST DUE 16 JAN 2021 N N N OBSERVATION
SINGLE 36W BARE BATTEN STAIRWELL TO UPSTAIRES OFFICE 1 FAULTY FITTING N N N COMPLETED ON SERVICE JOB 52439
EXTERNAL LIGHTING OUTSIDE OF STORE - VARIOUS EXTERNAL LIGHTING NOT WORKING N N N EXTERNAL LIGHTING. TO BE REPAIRED DURING QUOTED WORKS 0947
SITE FOLDER STORE 1 NO SITE FOLDER N N N NEW FOLDER REQUIRED, WITH NEW PLAN TO UPDATE EMERGENCY LIGHTING LAYOUT DUE TO NEW DESIGN IN KITCHEN AREA. UPDATE NEXT AUDIT.
Site Status SelectorCompleted but with repairs required
Next Test Due in 6 months29/10/2021